Skip to main content
Sobha Neopolis Phase 2
Sobha Limited

Sobha Neopolis Phase 2

by Sobha Limited

## Sobha Neopolis Phase 2 Sobha Neopolis Phase 2 continues the magnificent Greek-themed vision of this sprawling 25.35-acre township on Panathur Road, East Bangalore. As an extension of Phase 1, this...
RERA RegisteredApartments
Price Range
On request — contact developer / RERA-registered sales office

About Sobha Neopolis Phase 2

Sobha Neopolis Phase 2

Sobha Neopolis Phase 2 continues the magnificent Greek-themed vision of this sprawling 25.35-acre township on Panathur Road, East Bangalore. As an extension of Phase 1, this phase maintains the same architectural excellence and Mediterranean lifestyle offerings while adding to the overall development of 1,600 apartments across 19 towers. The project offers spacious 3, 3.5, and 4 BHK configurations with Grecian-inspired design elements throughout.

Seamless Integration

Phase 2 is seamlessly integrated with Phase 1, sharing the township's extensive amenities and infrastructure. Residents enjoy access to all three themed clubhouses - Club Santorini, Club Athinos, and Club Syros - along with the Olympus Plaza, Santorini Village, and numerous recreational facilities. The 78% open spaces ensure abundant greenery and fresh air throughout the development.

Prime East Bangalore Location

Panathur Road has emerged as one of the most sought-after residential destinations in East Bangalore, offering excellent connectivity to IT hubs along Outer Ring Road, Whitefield, and Sarjapur. The area benefits from established social infrastructure including reputed schools, hospitals, shopping centers, and entertainment venues. The proximity to tech parks makes it ideal for IT professionals seeking quality homes near their workplaces.

Comprehensive Amenities Package

Phase 2 residents enjoy the full complement of 35+ world-class amenities including Aqua Park, Amphitheatre, Clock Tower, sports facilities (tennis, basketball, cricket, skating), swimming pools, gymnasium, mini theatre, jogging tracks, landscaped gardens, co-working spaces, and 24/7 security. The Mediterranean-themed common areas create a resort-like ambiance for everyday living.

Why Choose Phase 2

With RERA registration (PRM/KA/RERA/1251/446/PR/200923/006270), Sobha Limited's proven track record, and the unique proposition of living in a Greek-themed paradise in the heart of East Bangalore, Phase 2 offers exceptional value. The 2028 expected completion timeline and competitive pricing make it attractive for both end-users and investors looking for premium properties in Bangalore's eastern growth corridor.

Project Details

Project Name
Sobha Neopolis Phase 2
Developer/Promoter
Sobha Limited
Location
Panathur Road
City
Bangalore
State
Karnataka
Project Type
Apartments
Units/Towers
Continuation of Phase 1
Expected Completion
2028
Amenities
24x7 Security with CCTV, Power Backup, High-Speed Passenger Lifts, Landscaped Gardens, Swimming Pool, Gymnasium, Clubhouse, Children's Play Area, Jogging Track, Indoor Games Room, Multipurpose Hall, Ample Visitor Parking, Rainwater Harvesting, Fire Safety System

RERA Registration

RERA Number
PRM/KA/RERA/1251/446/PR/200923/006270
Registration Date
20/09/2023

Always verify project registration on the official RERA portal before making any investment decisions.

Managing This Project?

Track tasks, inventory, and expenses with Site Setu - the construction super app.

Start Free Trial

Verification Reminder

Match the promoter, project phase, registration number, and status on the official portal before you treat this listing as verified.

Open Karnataka RERARead the full verification workflow

HRERA Detailed Information

Promoter Information

Company Name
Sobha Limited
CIN
L45201KA1995PLC018475
Address
Sarjapur-Marthahalli Outer Ring Road, Bellandur Post, Bengaluru - 560103, Karnataka
Website
https://www.sobha.com/

Key Personnel

Mr. Suresh Ganiga
Authorized Signatory (RERA)
Mr. N.B. Ashok Kumar
Authorized Signatory (BBMP drawings)
Mr. Jagadish Nangineni
Managing Director / CEO

Land Details

Permissible FAR
3
Proposed FAR
2.99
Village
Panathur, Varthur Hobli

Unit Details

Financial Overview

Project Timeline

Start Date
01/01/2024
Expected Completion
2028

Approvals & Clearances

RERA Registration Certificate (Phase 2)
Registered 20-09-2023; live validity UNKNOWN this run (portal down)
BBMP Building/Development Plan Approval
2023
Approved (sanctioned drawings read first-hand)
Fire Safety NOC
Per RERA filing (township-level)
KSPCB Consent / Environment
Per RERA filing (township-level)
Sewerage & Water (BWSSB)
Per RERA filing; treated-water-use condition (BWSSB DO 25-09-2019) on sanctioned plan
Land Conversion (DC)
Completed (township parcel)

Escrow Account

Drawing Review & Quality Assessment

Building Overview

Project Type
Residential Plotted Development
Building Type
Plotted Development

Parking Provisions

Amenities

Swimming PoolGymClubhouseJogging TrackCricketSpaTheatreAmphitheatreGardenParkLandscapSecurityClub Santorini / Athinos / SyrosOlympus PlazaAqua Park / Meandering PoolSwimming + Kids PoolGymnasiumTennis / Basketball / BadmintonNet CricketSkating RinkCycling / Jogging TrackMini TheatreCo-working SpacesSTPRainwater Harvesting24/7 CCTVPower Backup

Quality Assessment

8.8/10
Excellent

Observations

  • 16 drawing file(s) available
  • Good variety of drawing types (6 distinct types)
  • Site plan available
  • Floor plan available
  • Elevation/section drawings available
  • Architectural-grade BBMP-sanctioned production drawings, architect-stamped (K. Geetha), electronically authenticated by BBMP.
  • Three sheets read first-hand this run incl. 9 pages of the 28-sheet block floor-plan set; full block tenement/area/parking statement transcribed.
  • Unit carpet areas are legally-registered K-RERA figures.
  • Only gaps: (a) per-wing W12/W13 unit split not isolated in the township-wide block statement; (b) amenity-block plan not in the RERA submission.

Review Summary

Auto-generated review based on 16 available drawing(s): Development Plan, Floor Plan, Floor Plan, Floor Plan, Floor Plan, CDP/Master Plan, Site Plan, Site Plan, Layout Plan, Elevation/Section, and 6 more.

Key Findings

  • 16 drawing file(s) available
  • Good variety of drawing types (6 distinct types)
  • Site plan available
  • Floor plan available
  • Elevation/section drawings available

Reviewed on: 7/2/2026

Frequently Asked Questions

What is the RERA number for Sobha Neopolis Phase 2?

Sobha Neopolis Phase 2 is registered under RERA with number PRM/KA/RERA/1251/446/PR/200923/006270 under Karnataka RERA.

What configurations are available at Sobha Neopolis Phase 2?

The project offers Continuation of Phase 1 units. Please contact the developer for specific configuration details.

What is the price range for Sobha Neopolis Phase 2?

Please contact the developer or visit the project website for current pricing information.

When is the expected possession date for Sobha Neopolis Phase 2?

The expected completion/possession date for Sobha Neopolis Phase 2 is 2028.

What amenities does Sobha Neopolis Phase 2 offer?

Please contact the developer for details about available amenities.

Who is the developer of Sobha Neopolis Phase 2?

Sobha Neopolis Phase 2 is developed by Sobha Limited, with registered office at Sobha Limited Sarjapur-Marthahalli Outer Ring Road, Bellandur Post, Bangalore - 560103 , Bengaluru Urban , Karnataka - 560103.

Where is Sobha Neopolis Phase 2 located?

Sobha Neopolis Phase 2 is located in Panathur Road.

What is the RERA number for Sobha Neopolis Phase 2?

Sobha Neopolis Phase 2 (Wings W12 & W13) is registered with Karnataka RERA as PRM/KA/RERA/1251/446/PR/200923/006270, registered on 20 September 2023, with Sobha Limited (CIN L45201KA1995PLC018475) as the promoter. It is one of five separate K-RERA phase registrations for the township. Verify current validity at rera.karnataka.gov.in.

Which wings make up Phase 2, and how is it different from the other phases?

Phase 2 comprises Wings W12 and W13 of the 19-tower Sobha Neopolis township. The phases differ mainly in their RERA registration and possession timeline: Phase 1 (Wings 14–19) is due Dec 2028, Phase 3 Dec 2029, Phase 2 Dec 2030, and Phases 4 & 5 Dec 2031. All phases share the same Panathur parcel, the same developer and the same township amenities.

What configurations and sizes are available in Phase 2?

Phase 2 is offered mainly as 3 BHK and 4 BHK apartments. RERA-registered 3 BHK carpet areas run roughly 1,131–1,453 sq.ft (super built-up ~1,611–1,915 sq.ft), and 4 BHK homes reach ~1,564–1,618 sq.ft carpet (SBA ~2,333–2,481 sq.ft). All wings rise 2 Basement + Ground + 18 floors.

What is the price range for Sobha Neopolis Phase 2?

Phase-2 3 BHK homes are priced roughly Rs 2.3 Crore to Rs 2.73 Crore (2025–26), at around Rs 15,600/sq.ft on average. Larger 4 BHK units price higher. Contact Sobha via sobha.com for current Phase-2 pricing and payment plans.

When is possession for Phase 2?

The RERA completion/possession date for Sobha Neopolis Phase 2 (Wings 12 & 13) is 31 December 2030 — a roughly 4.5-year horizon from mid-2026, which is a meaningful capital lock-in to factor into your decision.

What amenities do Phase 2 buyers get?

Phase 2 residents share the full township amenity set across all five phases: three Greek-themed clubhouses (Club Santorini, Athinos, Syros; ~77,850 sq.ft combined), Olympus Plaza, an Aqua Park and pools, an amphitheatre, tennis/basketball/badminton courts, net cricket, a skating rink, cycling and jogging tracks, a mini theatre, co-working spaces and a gym — 35+ amenities with 78% open space.

Who is the developer and how strong is buyer recourse?

Sobha Limited (CIN L45201KA1995PLC018475), founded 1995 and listed on BSE/NSE, with 118+ completed projects across 27 cities and 14 states. Sobha is the direct RERA promoter (parent-direct, no SPV), so recourse runs against the listed-parent balance sheet — the strongest promoter-coverage tier. The neighbouring, occupied Sobha Dream Acres on the same road is a delivered reference. Note each phase has its own separate 70% RERA escrow account.

Is there a valid BBMP approval and Occupancy Certificate for Phase 2?

Yes for the plan: BBMP sanctioned the building/development plan (Project PRJ/11980/22-23; TPC Resolution 2.A.02/2022 dt 22-08-2022), visible first-hand on the sanctioned drawings. The OC is not yet issued — Phase 2 is under construction with possession due Dec 2030. (The OC PDFs filed with the RERA submission belong to neighbouring completed Sobha projects, submitted as developer credibility evidence.)

Project Drawings & Documents

Explore all Bangalore RERA projects

Jump to city and state hubs, neighbouring markets, and top metros to keep browsing.

Streamline Your Construction Project

From task management to inventory tracking, Site Setu helps construction teams work smarter with a mobile-first platform built for Indian construction sites.