RA bill checking from your documents
We check a running account (RA) bill against the documents you send: the contract BOQ or work order, the measurement sheets, the drawings and the previous bill. You get every difference listed with its amount. It is a document check, done remotely. We do not certify that the work was done.
Send the bill for a quote on WhatsAppWho it is for
- Developers, owners and PMCs checking a contractor's bill before it is certified.
- Contractors who want their own bill checked before they submit it.
Tell us which side you are on when you send the bill.
What we check
| Part | What we do |
|---|---|
| Quantities | We re-add every measurement line (numbers × length × breadth × depth, with deductions) and check the bill quantity against the measurement sheets or measurement book. Where you send drawings, we measure the items that make up most of the bill value from the drawings and compare. We check that "up to date less previous" equals this bill, and flag any item that has passed its contract quantity. |
| Arithmetic | Quantity × rate, sub-totals, the abstract, carry-forwards from sheet to sheet, GST and rounding. |
| Rates | Each billed rate and unit against the contract BOQ or work order. Part rates and reduced rates are listed for you to confirm. |
| Deductions | Retention, mobilisation and secured advance recovery, TDS, materials issued by the client, power and water, cess, hold amounts and earlier payments: each against the percentage or clause in the contract you send. |
| Extra items | Items outside the contract BOQ are listed apart, with whether an approved rate or variation order was sent. |
| Steel | Where you send a bar bending schedule, the steel quantity against it. |
What you send
- The contract BOQ or work order, with rates and payment terms (retention, advances, taxes).
- The RA bill: abstract and measurement sheets. Excel is best; PDF or scans take longer.
- The drawings the billed work was built from, with the revision list.
- The previous bill's abstract, and all earlier bills if you have them.
- Approved extra-item rates or variation orders, and the material issue statement if the client supplies materials.
Your contract, rates and bill stay with us and are not shown to anyone else.
What you get
- A check sheet in Excel, and the same as a PDF. One row per bill item: billed quantity, checked quantity, billed rate, contract rate, the difference in amount, and a short reason with the sheet or drawing it comes from.
- A first page with the totals: amount claimed, amount as checked, the net difference split by cause (quantity, rate, arithmetic, deductions, extra items), and a list of what could not be checked, with the reason.
Our result says where the bill agrees with the documents sent and where it does not.
What we do not do
- We do not certify that the work was done, or how far it has progressed.
- No site visit and no measuring at site.
- No quality check.
- No tax or legal opinion. We check deductions against the contract's own figures.
- We do not sign as the certifying engineer.
How long it takes
These are estimates, and we confirm the date once we have seen the documents.
- A civil bill of about 50 to 100 items, with measurement sheets in Excel: about 2 working days.
- The same bill from PDF or scans, or with a full check against drawings: about 3 to 4 working days.
- The first bill of a contract takes longest, because the contract BOQ and earlier bills are set up once.
What this rests on
RA bill checking is a new service for us. It rests on work we do every day: bills of quantities and bar bending schedules measured from drawings.
For a quote, tell us
- The number of items in the bill abstract, and roughly how many measurement lines.
- The trades in the bill: structure, finishes, services, façade.
- The floors or blocks this bill covers.
- Whether the inputs are in Excel, or PDF and scans.
- Whether quantities are to be checked against drawings, and for all items or only the high-value ones.
- Whether it is the first bill of the contract or a later one, and whether you want it every month.
- Whether you want the steel checked against the bar schedule.
- The bill value, as a measure of size.
Questions
Is this a bill certification?
No. We check the bill against the documents you send and list the differences. Your authorised engineer certifies the work and decides the payment.
Do you visit the site?
No. The check is done remotely from documents. We do not measure at site or confirm progress.
Can you check a bill without drawings?
Yes. We check quantities against the measurement sheets, and rates and deductions against the contract. The comparison with drawings is done only where drawings are sent.
Which deductions do you check?
Retention, advance recovery, TDS, client-issued materials, power and water, cess, hold amounts and earlier payments, each against the percentage or clause in your contract. We give no tax or legal opinion.
What if something cannot be checked?
It is listed on the first page with the reason, for example a missing measurement sheet or an extra item with no approved rate.
Can a contractor use this before submitting a bill?
Yes. Tell us you are the contractor, and we check your bill the same way before it goes to the client.