Skip to main content

BOQ from drawing / For contractors

BOQ and quantity takeoff for contractors: bid and bill from measured quantities

Send the tender or GFC drawings. Get an item-wise BOQ priced on CPWD DSR, your state SOR or market rates, with L×B×D measurement sheets you can bill against, a bar bending schedule and shuttering areas.

Fixed price per project, from ₹2,500 for a house up to about 1,500 sq ft (larger projects priced from your drawings) · first project 50% off, minimum ₹2,500

Published 5 October 2026. Written by Yogesh Kumar, Civil Engineer (IIT Bombay).

Who can prepare a tender BOQ from drawings for a contractor in India?

SiteSetu prepares tender BOQs for contractors across India. Send the tender or GFC drawings as PDF or DWG. You get an item-wise BOQ in Excel and PDF, priced on CPWD DSR, your state SOR or market rates, or quantities only, with IS 1200 L×B×D measurement sheets, a bar bending schedule and shuttering areas.

What you get, by job

Pick what the job needs. Every BOQ is in Excel, with the measurement behind each quantity.

To bid a government tender

  • BOQ priced on CPWD DSR or your state SOR, the schedule and year you name
  • Measured quantities from the drawings, so you can check them against the department's tender BOQ
  • Quantities only, if you prefer to apply your own rates and percentage

To bid private work

  • BOQ priced at current market rates for your city, with rate analysis for the main items
  • Abstract of cost with section-wise subtotals and GST
  • Assumptions listed wherever the drawings are silent, so you can price the risk or ask before you bid

To bill the work

  • L×B×D measurement sheets following IS 1200, floor by floor and member by member
  • Every quantity traced to a drawing, so a billing engineer can check it line by line
  • Units your billing uses: m³ and m², or cft and sq ft

Steel and shuttering

  • Bar bending schedule from the structural drawings: bar marks, shapes, cut lengths and weight by diameter
  • Steel abstract by member and floor
  • Shuttering contact area member by member, or billable area to your own subcontract rules

Background reading: tender BOQ pricing checklist · CPWD DSR guide · RA bills · bar bending schedule · shuttering and formwork

Site already running? Our billing desk does the measurement book, one RA bill and the BBS every month, from ₹7,500 a month per site.

Structure quantities you can check: our example G+1 house

The BOQ abstract and measurement sheet of our example two-storey house show how concrete, steel and formwork are measured and marked.

  • RCC M20 in 7 items, 61.206 m³ in all: footings 16.662 m³, columns 10.311 m³, slabs 19.137 m³, then plinth beams, beams, stairs and lintels.
  • Fe500D steel 5,473.430 kg in 5 diameters, 6 mm to 16 mm, from the bar bending schedule.
  • Formwork in 5 items, from footing sides to stair soffits, in m².
  • 857 measurement lines, each with its drawing reference, level and member, adding up to 43 BOQ items.
  • Every item marked firm (21) or "assumed, to confirm" (22), so you can see which quantities rest on an assumption.

Our example G+1 house is our own, drawn for teaching; no client's file was used. Download, free: BOQ abstract (Excel) · BOQ abstract (PDF) · Measurement sheet (Excel) · Measurement sheet (PDF) · Drawings (PDF).

How it works

From drawings to a BOQ you can bid on in four steps, under 48 hours, depending on project complexity and scope.

  1. Send the tender or GFC drawings

    On WhatsApp or through the form below: PDF or DWG, architectural and structural. Add the tender BOQ if the department issued one.

  2. We confirm on WhatsApp

    We confirm the scope, the rate basis (DSR, SOR, market or quantities only), the units you bill in and your deadline before starting.

  3. Engineers measure, a second take-off checks

    Our engineers take off the quantities following IS 1200, and a second take-off checks every measurement sheet and the BBS before delivery.

  4. Excel you can bid and bill from

    BOQ, measurement sheets and BBS in Excel and PDF, under 48 hours, depending on project complexity and scope.

Our method

Why our quantities are accurate

  • Modelled in 3D first

    Every footing, column, beam and slab is its own element. The BOQ is read off the model.

  • Click any element to check it

    Each element shows its measurement and the BOQ line it feeds. We share the model in the portal on request.

  • Junctions counted once, then checked again

    Shared concrete at column-beam-slab junctions goes to one member, and a second take-off is compared line by line.

See how we measure →
3D view of our example house, a made-up sample house: columns, beams, slabs, walls and windows as separate elements
Our example house: a made-up sample house, not a client's project.

Who can calculate the shuttering (formwork) area from drawings for billing?

SiteSetu does, from your tender or GFC drawings as PDF or DWG. We measure the formwork contact area member by member, or the billable area to your own subcontract rules, such as multipliers for tall storeys and how shafts and projections count. You get it in Excel and PDF, with the IS 1200 L×B×D measurement sheets behind it.

Work we did for contractors and developers

A shuttering contractor's billable area and a developer's tender BOQ, measured from their drawings. Names withheld.

All BOQ case studies · Sample BOQ of our example G+1 house

What we do not do

  • We measure from drawings, not from site. For an RA bill, the quantity of work actually done still comes from your site records and measurement book; our sheets give the full drawing quantity to bill against.
  • Your bid is your decision. DSR, SOR or market rates are a pricing basis; the percentage above or below, overheads and margin are yours to set.
  • The BOQ is only as complete as the drawing set. Missing details are listed as assumptions, and we update the quantities when you send them.

Prices

Before you order, you see a sample BOQ of the same kind of work, with its measurement sheets. Then a fixed price per project, agreed before we start. First project 50% off, minimum ₹2,500.

Project and scopePrice per project
Simple houseEstimate from your floor plansfrom ₹2,500
Luxury home or villaMaterial-wise BOQ. From floor plans, section and elevationsfrom ₹10,000
High-rise10 typical floors, 3 basements, 2 podiums

Structure: RCC concrete, steel with BBS and formwork.

Full: structure plus masonry, plaster, flooring, doors, windows and finishes.

₹25,000 structure₹50,000 full BOQ
Infra and bridgesDrawing set and measured scope confirmed in the quote.Quote-based, ₹25,000 – ₹1,00,000

Opening prices; final quote after we see your drawings. Send PDF or DWG drawings, or a Drive link. We confirm the included trades, assumptions, deliverables and how any first-project offer applies before work starts.

What decides the final quote →

Get a quote for your next bid

Share your drawings and contact details. We confirm the scope and price on WhatsApp before any work begins, and share a sample of the same kind of work.

Send drawings on WhatsApp

or use the form

How will you share the drawings? *

PDF or DWG, several files allowed, up to 4 MB in total.

Helps us size the quote (optional)

More details (optional)

We reply on WhatsApp within working hours. Your drawings stay confidential and are used only to prepare your BOQ.

Frequently asked questions

Can you prepare a BOQ for a government tender on DSR or SOR?

Yes. We price the measured quantities on CPWD DSR or your state's schedule of rates. Tell us which schedule and year the tender uses when you send the drawings.

Do you give measurement sheets I can use for RA bills?

Yes. Every BOQ comes with L×B×D measurement sheets following IS 1200, floor by floor and member by member, each line traced to a drawing. For each RA bill you take the work done from site, and the sheets give you the drawing quantity to check it against.

Do you prepare a bar bending schedule?

Yes, from the structural drawings: bar marks, shapes, cut lengths, number of bars and weight by diameter, with a steel abstract by member and floor. It is part of every structure BOQ.

Can you calculate shuttering area for billing?

Yes. We measure formwork contact area member by member, or the billable area to your own subcontract rules, such as multipliers for tall storeys and how shafts and projections count.

How fast can I get a BOQ for a tender deadline?

The BOQ is delivered under 48 hours, depending on project complexity and scope, counted from when the drawings and scope are confirmed. Tell us the tender closing date on WhatsApp before you send the set.

Can you check the department's tender BOQ quantities against the drawings?

Yes. Send the tender BOQ with the drawings. We measure the quantities from the drawings, so you can compare them with the department's figures item by item before you quote.

Can you price a private tender at market rates?

Yes. We price the BOQ at current market rates for your city, with rate analysis for the main items and an abstract of cost with section-wise subtotals and GST. The percentage, overheads and margin you bid stay your decision.

How do you show quantities the drawings do not settle?

We list them as assumptions, so you can price the risk or ask before you bid. In our example house BOQ each item is marked firm, measured from drawn sizes, or "assumed, to confirm", with the assumption written out: 21 of 43 items are firm.

Can I get quantities in cft and sq ft instead of m³ and m²?

Yes. Tell us the units your billing uses when you send the drawings: m³ and m², or cft and sq ft.

How much does a BOQ for a tender cost?

One fixed price per project: simple house from ₹2,500 (estimate from floor plans); luxury home or villa from ₹10,000 (material-wise BOQ from floor plans, section and elevations); high-rise ₹25,000 (structure) or ₹50,000 (full BOQ); infra and bridges quoted at ₹25,000–₹1,00,000. Final quote after we see your drawings. First project 50% off, minimum ₹2,500.

Building your own house? BOQ for house construction · An architect or interior designer? BOQ for architects and interior designers · About our BOQ preparation service

Yogesh Kumar

Civil Engineer | IIT Bombay

Writes SiteSetu's measurement and estimating guides. Published 5 October 2026; prices come from the live SiteSetu price card. More by Yogesh