Construction cost estimation services from your drawings

An item-wise cost estimate for your house, building or interior work: every quantity measured from the drawings, priced on the rate basis you choose and totalled in an abstract of cost you can check line by line.

For home owners, contractors, architects and builders across India. We work online from your drawings; we don't visit site.

Estimates from ₹2,500 for a house up to about 1,500 sq ft (larger projects priced from your drawings). First project 50% off, minimum ₹2,500.

Who can prepare a construction cost estimate from my drawings?

SiteSetu does, for builders, contractors, architects and home owners across India. Send your drawings as PDF or DWG; our engineers measure every item to IS 1200, price it on CPWD DSR, your state's schedule of rates, market rates or your own rates, and send an item-wise estimate in Excel with an abstract of cost. Most estimates are delivered in hours, 48 hours at most from drawing confirmation, depending on scope.

Which estimate do you need?

The right estimate depends on how far the design has gone. A per-sq-ft figure is enough to decide whether to build; a budget you can hold a contractor to needs quantities measured from drawings.

EstimateUse it forWhat it needsWhere to get it
Preliminary (per sq ft) estimateDeciding whether to build and how big, before drawings exist.Built-up area, floors, city and finish level.Our free house construction cost calculator and the monthly cost index; no order needed.
Detailed item-wise estimateA budget you can hold a contractor to, and the basis for comparing quotes.Working or good-for-construction (GFC) drawings: plans, sections, elevations, structure.This service: every item measured, priced and totalled in an abstract of cost.
Tender or bid estimatePricing a BOQ to bid, or checking bidders against the same quantities.Tender drawings, BOQ or specifications, and the rate basis to use.This service, on the tender's rate basis or your own work-order rates.
Revised estimateDrawings or specifications changed after the first estimate.The revised drawings and the revision list.This service: changed items re-measured, with the difference shown item by item.

For an early figure, the Construction Cost Index puts a standard G+1 house at ₹1,700–2,100 per sq ft in November 2026 (national average, materials and labour), and the house construction cost calculator gives an item-wise range for your city. Both are ranges; the detailed estimate replaces them with priced quantities.

What the estimate contains

  • Measurement sheets (Nos × L × B × D) with the drawing, floor and grid behind every quantity, measured to IS 1200.
  • An item-wise BOQ with full item descriptions and units, grouped by trade.
  • Rates on the basis you choose, with the rate source and date stated, and rate analysis for the main items when you ask for it.
  • An abstract of cost by trade and floor, so the total can be checked line by line.
  • Material quantities for ordering: cement bags, steel by diameter from the BBS, sand, aggregate, bricks or blocks.
  • A list of assumptions and exclusions, so nothing the drawings don't show is priced silently.
  • Excel with live formulas, plus a PDF of the BOQ.

See the format first in the sample house BOQ with its Excel download, or follow a footing and a wall from measurement to abstract in our worked building estimate.

Rates: DSR, state SOR, market or your own

The quantities don't change with the rate basis; the prices do. Choose the basis that matches how the work will be paid.

CPWD DSR

Government and institutional work, or when the client asks for DSR-based rates.

How the CPWD DSR works

State SOR

Work for state departments, or a contract that names the state schedule of rates.

Market rates

Private houses and buildings, priced on current local material and labour rates, each with its source and date.

Your own rates

Contractors pricing a bid or checking a work order on their agreed rates.

How a rate is built up from material, labour, plant, overheads and profit is explained in our rate analysis guide.

Who uses our estimation services

Home owners

Know the real cost before you sign, and send every contractor the same BOQ so their quotes compare line by line.

Contractors

Price a bid from measured quantities instead of a per-sq-ft guess, and keep the same BOQ for billing later.

Architects and consultants

Give your client an item-wise budget at drawing stage, and update it when the design changes.

Developers and builders

Budget a project block by block, and check contractor bills against the estimated quantities.

Building something specific? See BOQs by project type, including villas, apartment buildings and interior work.

How it works

  1. 1. Send the drawings

    Send PDF or DWG drawings on WhatsApp or by email: plans, sections and elevations for the building, structural drawings for RCC and steel, and services drawings if MEP is in scope. Tell us the city and the rate basis you want.

  2. 2. Agree the scope and price

    The desk checks the set, lists missing details and shares a sample from a similar real job. You confirm the trades, the rate basis and the price before any work starts.

  3. 3. Receive a checked estimate

    Our engineers measure every item from the drawings and a second take-off checks the first. You receive the measurement sheets, the priced BOQ, the abstract of cost and the assumptions list.

  4. 4. Update it as the design changes

    When drawings are revised, send the revision list. The changed items are re-measured and the difference is shown item by item, so you can see what moved the total.

Need steel quantities for the site as well? A bar bending schedule from your structural drawings can be ordered with the estimate. For billing once work starts, see the monthly billing desk and our online quantity surveyor scopes.

Estimation prices

Estimates use the BOQ price card. The quote confirms the drawing set, the trades and the final price before work starts.

Project and scopePrice per project
Simple houseEstimate from your floor plansfrom ₹2,500
Luxury home or villaMaterial-wise BOQ. From floor plans, section and elevationsfrom ₹10,000
High-rise10 typical floors, 3 basements, 2 podiums

Structure: RCC concrete, steel with BBS and formwork.

Full: structure plus masonry, plaster, flooring, doors, windows and finishes.

₹25,000 structure₹50,000 full BOQ
Infra and bridgesDrawing set and measured scope confirmed in the quote.Quote-based, ₹25,000 – ₹1,00,000

Opening prices; final quote after we see your drawings. Send PDF or DWG drawings, or a Drive link. We confirm the included trades, assumptions, deliverables and how any first-project offer applies before work starts.

First project 50% off, minimum ₹2,500.

Timing: in hours, 48 hours at most from drawing confirmation, depending on project complexity and scope.

Get your estimate quote

Construction estimation FAQs

Scope, rates, accuracy, prices and timing for estimates prepared from your drawings.

Who prepares a construction cost estimate?

Usually a quantity surveyor or estimating engineer, working for the owner, the consultant or the contractor. They measure each item from the drawings, price it and total it in an abstract of cost. If you don't have one, SiteSetu prepares it from your drawings, online, for projects anywhere in India.

What is the difference between an estimate, a BOQ and a quotation?

A BOQ lists every item of work with its description, unit and quantity. An estimate prices those quantities to give the expected cost of the project. A quotation is a contractor's offer to do the work at their price. The same BOQ is the base for all three, which is why it should come first.

Can you estimate the cost without drawings?

Only as a per-sq-ft figure. For a standard G+1 house the November 2026 cost index puts the national figure at ₹1,700–2,100 per sq ft, and our house cost calculator gives an item-wise range by city. A detailed estimate needs drawings, because the quantities come from them.

How accurate is a detailed estimate?

It is as accurate as the drawings and the rates. The quantities are measured, not assumed, so the main uncertainty is in rates and in items the drawings don't specify yet, such as finishes or fittings. We list every assumption, so you can see what is fixed and what still depends on choices.

Which rates do you use?

The basis you choose: CPWD DSR, your state's schedule of rates, current local market rates, or your own work-order rates. Every rate carries its source and date, and rate analysis for the main items is available on request.

How much do construction estimation services cost?

Estimates follow our BOQ price card: simple house from ₹2,500 (estimate from floor plans); luxury home or villa from ₹10,000 (material-wise BOQ from floor plans, section and elevations); high-rise ₹25,000 (structure) or ₹50,000 (full BOQ); infra and bridges quoted at ₹25,000–₹1,00,000. First project 50% off, minimum ₹2,500. Your quote confirms the scope and final price before work starts.

How long does an estimate take?

Most estimates are delivered in hours, 48 hours at most from drawing confirmation, depending on project complexity and scope.

Do you estimate interiors and MEP work?

Yes. Interior estimates are measured from the interior drawings (ceilings, joinery, flooring, finishes), and MEP estimates from the services drawings (electrical, plumbing, HVAC), when those drawings are part of the set. Roads, bridges and other infrastructure are quoted per project.

Do you visit site?

No. Estimates are prepared from the drawings you send, so we ask about anything the drawings don't show instead of assuming it. If you need someone physically on site, you need a local professional for that part.