BOQ preparation service / Cost
How much does BOQ preparation cost in India?
BOQ preparation costs from ₹2,500 for a simple house with SiteSetu, and from ₹10,000 for a luxury home or villa. Delivered in under 48 hours, depending on project complexity and scope. First project 50% off, minimum ₹2,500, and the final quote comes after we see your drawings.
Prices updated 5 October 2026. Written by Yogesh Kumar, Civil Engineer (IIT Bombay, ex-IOCL).
BOQ preparation cost by project type
One price per project. Pick the row closest to your project; the final quote comes after we see your drawings.
| Project and scope | Price per project |
|---|---|
| Simple houseEstimate from your floor plans | from ₹2,500 |
| Luxury home or villaMaterial-wise BOQ. From floor plans, section and elevations | from ₹10,000 |
| High-rise10 typical floors, 3 basements, 2 podiums Structure: RCC concrete, steel with BBS and formwork. Full: structure plus masonry, plaster, flooring, doors, windows and finishes. | ₹25,000 structure₹50,000 full BOQ |
| Infra and bridgesDrawing set and measured scope confirmed in the quote. | Quote-based, ₹25,000 – ₹1,00,000 |
Opening prices; final quote after we see your drawings. Send PDF or DWG drawings, or a Drive link. We confirm the included trades, assumptions, deliverables and how any first-project offer applies before work starts.
Your project not in the table, or between two rows? Send the drawings and we will quote it.
What decides your final quote
The price card covers typical projects. The final quote follows the measuring effort. Four things drive it: how many trades are measured, whether MEP services are included, how large and clean the drawing set is, and whether you want the BOQ priced or as quantities only.
| Factor | Keeps it lower | Pushes it up |
|---|---|---|
| Trades in scope | Structure only (excavation, PCC, RCC, reinforcement) | Full civil, finishes, doors and windows, external works |
| MEP services | Not included | Plumbing, sanitary, electrical and drainage measured from drawings |
| Drawing set | Few sheets, clean DWG, repeated typical floors | Many sheets, scanned PDFs, every floor different |
| Rate basis | Quantities only — your team applies its own rates | Priced on CPWD DSR, a state SOR or market rates with rate analysis |
Priced BOQs follow the measurement standard in IS 1200 and build item rates the way our rate analysis guide describes. The price never depends on your construction budget — a premium specification with the same drawings costs the same to measure.
What the BOQ preparation fee includes
- Item-wise BOQ in Excel — units, quantities, rates and amounts, trade by trade
- L×B×D measurement sheets following IS 1200, so every quantity traces back to a drawing
- Abstract of cost with section-wise subtotals and GST
- Cement, steel and key material consumption summary
- A list of the assumptions made where the drawings are silent or unclear
Delivered in Excel and PDF by email and WhatsApp. See a full sample BOQ from a real G+1 house.
BOQ preparation charges in India: what others report
Most BOQ services in India do not publish a price and quote on WhatsApp after seeing the drawings. These are the figures that are publicly listed, as reported by each source on 29 September 2026. Scope differs between providers, so compare what is delivered, not just the headline number.
| Source | Reported price | Basis |
|---|---|---|
| Construction Estimator India (own service) | From ₹10,000 per project | Per project; turnaround not stated |
| Construction Estimator India (typical consultant rates) | ₹8–12/sq ft basic estimate; ₹15–25/sq ft detailed tender BOQ | Per sq ft; metros said to carry a 20–30% premium. The site also sells BOQ templates |
| IndiaMART listing, Pune (Jabez Enterprises) | ₹1.50/sq ft | Quantity surveying and estimation; turnaround not stated |
| IndiaMART listing, Pune (Sachin Kulkarni & Associates) | ₹1.50/sq ft | Per sq ft of building area; building estimation |
| IndiaMART listing, Ghaziabad (Archplanest) | ₹6,000 excluding taxes | Construction BOQ and cost estimation; unit not stated |
| MakeBOQ | No price published; quote on WhatsApp | Reports 24–48 hours up to 2,000 sq ft, 2–3 working days for larger projects |
Architects usually do not bill a BOQ separately. The Council of Architecture's Guidelines for Architectural Services & Fees place the “schedule of quantities” inside the architect's basic fee at the tender stage, and treat detailed cost estimates and quantity surveys as an additional service. If your architect's scope already covers the BOQ, ask for it before paying anyone else.
Is a paid BOQ worth it for a house?
Compare the fee with what it measures. A 1,500 sq ft house costs about ₹30 lakh to build; a ₹2,500 BOQ is under 0.1% of that. What you get for it is a quantity for every item, so you can check a contractor's quote line by line instead of accepting a single per-sq-ft figure. Our construction cost per sq ft guide explains what that per-sq-ft figure hides.
What we do not do
- We measure from drawings only. There is no site visit, so work that is not drawn (site levelling, existing structures to demolish) is listed as an assumption, not measured.
- The BOQ is only as complete as the drawing set. Missing sections or schedules are flagged in the assumptions list; you can send them and we update the quantities.
- Rates from DSR, an SOR or the market are a pricing basis, not a contractor's quote. Use the BOQ to invite and compare quotes.
Get an exact quote
Share your drawings and contact details. We confirm the area, scope and price on WhatsApp before any work begins, and share a sample from a similar real job.
Frequently asked questions
How much does BOQ preparation cost in India?
With SiteSetu, indicative prices per project are: simple house from ₹2,500 (estimate from floor plans); luxury home or villa from ₹10,000 (material-wise BOQ from floor plans, section and elevations); high-rise ₹25,000 (structure) or ₹50,000 (full BOQ); infra and bridges quoted at ₹25,000–₹1,00,000. Final quote after we see your drawings. First project 50% off, minimum ₹2,500.
What are BOQ preparation charges per sq ft?
We do not charge per sq ft. You pay one price per project, set by the project type and the scope you need. Many other providers quote per sq ft; see the table of reported rates on this page.
What is the difference between a structure BOQ and a full BOQ?
A structure BOQ covers RCC: concrete, steel with bar bending schedule, and formwork. A full BOQ adds masonry, plaster, flooring, doors, windows and finishes.
Can I check your work before I pay?
Yes. You see a sample from a similar real job before you order. On your first project, consultants review a masked preview before the final payment, and contractors get a full refund if the first element doesn't match the drawing.
Does the price include rates and amounts?
Yes, if you want it priced. We can price the BOQ on CPWD DSR, a state schedule of rates or current market rates, or deliver quantities only so your team applies its own rates. Tell us the basis when you send the drawings.
How long does a BOQ take?
BOQ in hours — under 48 hours, depending on project complexity and scope, counted from when the drawings and scope are confirmed.
Yogesh Kumar
Civil Engineer | IIT Bombay | ex-IOCL
Writes SiteSetu's measurement and estimating guides. Published 29 September 2026; prices updated 5 October 2026 and checked against the live SiteSetu offer whenever it changes. More by Yogesh