What is cutting length in construction?

Cutting length is the length of straight bar cut from stock to make one bar mark in a BBS, before it is bent. It equals the bar's straight lengths after cover, plus hook allowances, minus bend deductions. For an 8 mm stirrup in a 230 × 450 mm beam with 25 mm cover, common site practice gives 1,224 mm.

Key facts

Formula
Lengths after cover + hook allowances − bend deductions
Unit
mm per bar; schedules often round up to the next 25 mm (IS 2502, clause 5.1.1)
Where it appears
The cutting length column of a BBS; weight = total length × kg per m
In our BBS calculator
1d, 2d and 3d bend deductions; 135° hook of max(10d, 75 mm)

How do you calculate the cutting length of a stirrup?

Take the outside stirrup size (member size minus twice the cover), add the two 135° hook extensions, and subtract three 90° and two 135° bend deductions: L = 2(a + b) + 2 × hook − (3 × 2d + 2 × 3d).

Worked example. A 230 × 450 mm beam, 25 mm cover to the outside of the stirrup, 8 mm stirrups:

StepWorkingResult
Outside width a230 − 2 × 25180 mm
Outside depth b450 − 2 × 25400 mm
Hook extensionmax(10 × 8, 75)80 mm
Bend deductions3 × (2 × 8) + 2 × (3 × 8)96 mm
Cutting length2 × (180 + 400) + 2 × 80 − 961,224 mm
Scheduled lengthrounded up to 25 mm1,225 mm

The hook of max(10d, 75 mm) follows IS 13920:1993. The amended IS 13920:2016 uses 8d with a 75 mm minimum, so match the edition on your drawings. IS 2502 Table VIII shape A gives 1,288 mm for the same stirrup; see bend deduction for why.

What is the cutting length of a column tie?

For a 350 × 350 mm column with 40 mm cover and 8 mm ties, the outside tie size is 270 × 270 mm and the cutting length is 1,144 mm, or 1,150 mm rounded up to 25 mm.

MemberWorkingCutting length
350 × 350 column, 40 cover, 8 mm tie2 × (270 + 270) + 2 × 80 − 961,144 mm, scheduled 1,150 mm
300 × 600 beam, 25 cover, 10 mm stirrup2 × (250 + 550) + 2 × 100 − (3 × 20 + 2 × 30)1,680 mm, scheduled 1,700 mm

For the 10 mm stirrup the hook is max(10 × 10, 75) = 100 mm and the deductions are 60 + 60 = 120 mm. Our BBS calculator gives the same figures with its default settings.

How do you find the cutting length of straight, bent and cranked bars?

For a straight bar, take the member length minus cover at both ends and add any hook allowances. For bent bars, add the legs after cover and subtract a bend deduction for each bend; cranked bars also add the extra slope length.

Using 12 mm bars, a 3,000 mm member and 25 mm cover:

BarWorkingCutting length
Straight3,000 − 2 × 252,950 mm
Straight with two end hooks2,950 + 2 × 1103,170 mm
L-bar, 600 mm leg2,950 + 550 − 2 × 123,476 mm
Two 45° cranks, 150 mm rise each2,950 + 2 × (√2 − 1) × 150 − 4 × 123,026.264 mm

The 110 mm hook is IS 2502's 9d allowance for a k = 2 hook (9 × 12 = 108 mm) rounded to the nearest 5 mm. Laps and development length are added where the drawing calls for them; see lap length.

How does cutting length give steel weight?

Multiply the cutting length by the number of bars to get total metres, then by the unit weight, D²/162 kg per metre. For 21 stirrups of 1,225 mm in 8 mm bar, that is 25.725 m and 10.16 kg.

StepWorkingResult
Number of stirrups, 4,000 mm span, first and last 50 mm in, 200 mm spacing(4,000 − 50 − 50) ÷ 200 = 19.5, round up to 20, + 121
Total length21 × 1,225 ÷ 1,00025.725 m
Weight25.725 × 8² ÷ 16210.16 kg

This is the beam example in our BBS guide. The calculator uses steel density by default and offers D²/162 as an option; the two differ by about 0.12%.

Common mistakes in cutting length

The usual ones are subtracting the bar diameter again from outside dimensions, adding a hook allowance and then deducting its bend, and mixing the site formula with IS 2502 shape allowances.

  • Diameter taken off twice. Member size minus twice the cover already gives the outside stirrup size.
  • Hook counted twice. A complete hook allowance includes its bend.
  • Mixed methods. Use the site formula or the IS 2502 shape formula, not parts of both.
  • Wrong cover. Cover is to the outside of the stirrup, not to the main bar.
  • Hook edition. Check whether the drawings follow 10d or 8d hook extensions.

Go deeper

Related terms

Sources

Checked 2026-11-03. Contract documents, tender conditions and the structural drawings for your project take precedence over the general rules on this page.

All construction terms in the glossary