Skip to main content

Bar Bending Schedule: Slab, Beam, Column, Footing

A bar bending schedule (BBS) lists every reinforcement bar by mark, shape, diameter, count, cutting length and weight. Below are four worked examples, for a slab, beam, column and footing, with each cutting length, bar count and weight calculated step by step.

Weights use D²/162 kg/m. Link lengths use the site approximations 45° = 1d, 90° = 2d and 135° = 3d for bend deductions, with a hook of max(10d, 75 mm); IS 2502, SP 34 and IS 13920 govern the approved bar shapes. These are worked quantities, not reinforcement designs. For the BBS format and full form, start with the BBS guide.

Watch: BBS full form and steel weight

BBS full form: bar bending schedule and steel weight

BBS stands for bar bending schedule: a bar-by-bar list of shape, diameter, cutting length, count and weight. Steel weight is about D²/162 kg per metre (D in mm), so a 12 mm bar 6 m long weighs about 5.33 kg.

Watch on: YouTube

Bar bending schedule (BBS) guide

What to check before issuing a BBS

Check that every bar on the drawings appears once, with its shape, cover, spacing zone and lap. Read plans, sections and the latest revision together. Keep theoretical steel, ordered stock and scrap as separate figures.

On hooks, the beam and column pages show where the 10d extension of IS 13920:1993 differs from the 8d of the amended IS 13920:2016.

Bar bending schedule FAQs

What does a bar bending schedule show?

A BBS identifies each reinforcement bar's member, mark, shape, diameter, count, cutting length and weight. The shape and drawing revision must stay with the quantity record.

Are these examples structural designs?

No. They are worked quantity examples with stated covers, sizes, spacings and exclusions. Build from your approved drawings.

What is in the downloadable workbook?

Four sheets: Slab, Beam, Column and Footing. Change the dimensions on any sheet and the counts, cutting lengths, total metres, weights and diameter totals recalculate.