Skip to main content

Module 10 of 10

Capstone: Drawing to Budget

One project carried from drawings to final bill — everything in the course, applied once. A fully specified G+1 duplex goes through takeoff, BOQ, stage budget and three RA bills, with every number reconciling.

After this module you can

You have produced a complete estimate, BOQ, budget and billing trail for a realistic G+1 duplex — and can repeat the same cycle on your own project.

  1. 10.1 The Capstone Project: A G+1 Duplex, Fully SpecifiedMeet Anand Villa: a synthetic but realistic G+1 duplex with every dimension, member size and finish decision locked down — the single project you will carry from drawing to final bill.8 min read
  2. 10.2 Capstone Takeoff: Substructure to RoofEvery major quantity for Anand Villa, measured member by member: 35.3 cum excavation, 43.5 cum RCC, 4,690 kg steel, 36.4 cum brickwork — each with its calculation visible.8 min read
  3. 10.3 Capstone BOQ and BudgetEvery takeoff quantity gets a rate: a 20-item BOQ totalling ₹29,20,036, a ₹1,884 per sqft sanity check, and a stage-wise budget of ₹30.66 lakh including contingency.8 min read
  4. 10.4 Capstone Billing Simulation: Three RA BillsThe Anand Villa contract goes live: RA-1 at month 2 (₹2.73 lakh), RA-2 at month 5 (₹8.22 lakh this bill) and a final bill with variations closing at ₹29.60 lakh.7 min read
  5. 10.5 Review, Certificate and Your Next 90 DaysOne table proves the whole trail reconciles, the certificate assessment is explained (25 questions, 70 percent to pass, free), and a concrete 90-day plan turns the course into a career skill.6 min read