Eldeco Live By The Greens (RERA Phase 1: UPRERAPRJ15172): price, possession and the verified record

Eldeco Live By The Greens is a 5.9582-acre, 572-unit 2 BHK, 3 BHK Apartments project by Eldeco Group at Sector 150, Noida, registered with UP RERA as Phase 1: UPRERAPRJ15172 and listed at Premium segment.

No conflicts found2 BHK, 3 BHK Apartments23 approved documentsReviewed 2026-07-30
Premium segmentPrice band
572Units registered
5.9582 acRegistered area
30 Jun 2025Latest declared completion
₹256.9 CrDeclared project cost

Is Eldeco Live By The Greens RERA approved?

Yes. It is registered with UP RERA under Phase 1: UPRERAPRJ15172, covering 5.9582 acres with 572 residential units and 4 recorded approvals.

  • Building plan approvalApproved · 10-03-2017
  • AAI height clearanceApproved · 13-02-2017
  • Environment clearanceApproved · 07-10-2016
  • Fire scheme approvalNot in the reviewed filing
  • Consent to establishApproved · 27-12-2017
  • Occupancy certificateNot expected until completion

Source: UP RERA registration certificate Phase 1: UPRERAPRJ15172.

When is possession at Eldeco Live By The Greens?

The record gives one declared completion date: June 2025. A declared date is what the promoter filed, not proof of delivery.

30 Jun 2025
binding
Phase I completion field
Not a reviewed OC/CC or current possession result.
June 2025
weakest
Marketing / listing material · also in The promoter's own RERA filing

None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery. What to ask for: Request current Phase I QPR, applicable OC/CC and a dated offer.

Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.

What is the price of Eldeco Live By The Greens?

Publicly listed at Premium segment for 2 BHK, 3 BHK Apartments. No dated, unit-specific price list was sourced against this registration, so treat the band as indicative rather than an offer.

Amenities on record

  • 24x7 Security with CCTV
  • Power Backup
  • High-Speed Passenger Lifts
  • Landscaped Gardens
  • Swimming Pool
  • Gymnasium
  • Clubhouse
  • Children's Play Area
  • Jogging Track
  • Indoor Games Room
  • Multipurpose Hall
  • Ample Visitor Parking
  • Rainwater Harvesting
  • Fire Safety System

Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.

Who is the developer of Eldeco Live By The Greens?

The promoter on record is Wondrous Buildmart Private Limited, marketed as Eldeco Group, registered at 7th Floor, Tower B, Plot No. 8, Sector-127, Noida - 201301, Uttar Pradesh. The declared project cost is ₹256.9 Cr.

Not attributed to a head ₹256.9 Cr
Not attributed to a head₹256.9 Cr100%
Declared total₹256.9 Cr100%

₹256.9 Cr of the declared cost is not attributed to any named head — that is 100% of the project with no breakdown anywhere in the filing.

See all RERA projects by Eldeco Group

The RERA escrow account is HDFC BANK LIMITED, A/c 57500000162803, IFSC HDFC0000923. Seventy per cent of buyer collections must sit there — payments made outside it are outside the RERA protection.

Source: the authority's promoter disclosure and the filed financial schedule.

What do the approved plans for Eldeco Live By The Greens show?

The layout, floor plans and elevations as filed. Every sheet below is rendered from a document the promoter lodged with UP RERA, and opens to the original upload — nothing here is a brochure render.

Source: the 23 documents filed under this registration.

Is it safe to buy in Eldeco Live By The Greens?

The registration itself is sound — identity, scope and phase all check out. 2 things are still open. Resolve that before you pay.

Do not merge Phase I and pocket totals
The 1,716-dwelling EC figure is broader SC-02/A9 context, while Phase I registration reports 572 units.
What to ask for: Confirm block, phase and registration number in the selected unit documents.
Later marketing dates are not Phase I evidence
Dec 2026/Feb 2027 marketing wording may concern later phases and no current Phase I close-out record was reviewed.
What to ask for: Request current Phase I QPR, applicable OC/CC and a dated offer.

Source: Site Setu agent-reviewed dossier, 2026-07-30. Record-quality assessment, not investment advice.

The verified record behind this page

Every figure above comes from a document filed with UP RERA. This is the audit that produced them — 4 dimensions assessed, every fact carrying its own confidence.

Record review

Agent-reviewed 2026-07-30 · 6 facts checked · 4 dimensions

Identity
Supported
Registered SPV separated from Eldeco brand
Scope
Needs a look
Phase I and EC pocket totals differ
Classification
Supported
Residential classification restored
Timeline
Not sourced
No current phase status
Canonical Phase I registration
Phase 1: UPRERAPRJ15172The dossier does not claim later pocket phases under this identifier.
high
Legal promoter
Wondrous Buildmart Private LimitedEldeco is branding/development-manager context; Wondrous is a Lotus Greens subsidiary SPV.
high
Phase I scope
572 unitsThis is distinct from broader SC-02/A9 numbers.
high
Broader pocket context
80,857 sq m and 1,716 dwellingsSEIAA EC scope for SC-02/A9, not Phase I count.
high
Project type
Residential group housingLocal drawings and approvals do not support a commercial classification.
high
Current close-out and offer
Not establishedNo current Phase I QPR, OC/CC, inventory or offer was reviewed.
not-found
▸ How this review was done, and what it excluded
Authority
UP RERA
Registration
Phase 1: UPRERAPRJ15172
Documents seen
11 drawing sets, 12 authority documents
3D reconstruction
Not built
Not established
Occupancy certificate, current construction progress, live inventory, dated unit-level offer

Source: Local UP-RERA, EC and approval-file reconciliation for SC-02/A9

The same filings, as a working project plan

A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.

Eldeco Live By The GreensDemo · read only

Overview

Eldeco Live By The Greens · Sector 150, Noida

From the RERA filing
₹256.9 Cr
Declared cost
572 units
5.9582 ac
Registered area
4
Approvals on file
of 6 typical
23
Documents on file
plans, approvals, legal

Record timeline

  1. 30 Jun 2025Phase I completion fieldNot a reviewed OC/CC or current possession result.
  2. June 2025Marketing possession claimweakest

Project card

Promoter
Wondrous Buildmart Private Limited
Registration
Phase 1: UPRERAPRJ15172
Authority
UP RERA
Units
572
Escrow
HDFC BANK LIMITED

This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.

Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.

Other registered projects nearby

Same corridor, same authority. Compared on what is filed, not on what is advertised.

ProjectPromoterPricePossession
Eldeco Live By The GreensEldeco GroupPremium segment30 Jun 2025
Eldeco La Vida BellaEldeco GroupOn request — contact developer / RERA-registered sales office16 January 2029 (RERA-declared)
Eldeco 7 Peaks ResidencesEldeco GroupOn request—
Eldeco Echoes of EdenEldeco GroupOn request—
Eldeco Ballads of BlissEldeco GroupOn request—
ATS Pious HideawaysATS HomekraftRs 2.14 - 2.55 CrSeptember 2026