Sobha City, Phase-5 (RERA RERA-GRG-PROJ-701-2020): price, possession and the verified record

Sobha City, Phase-5 is a 5.10183-acre, 192-unit 192 project by Sobha Limited at Revenue Estate of Babupur Village, Sector-108, Gurugram, Haryana, registered with HRERA Gurugram as RERA-GRG-PROJ-701-2020 and listed at On request — contact developer / RERA-registered sales office.

No conflicts found19214 approved documentsReviewed 2026-08-02
On request — contact developer / RERA-registered sales officePrice band
192Units registered
5.10183 acRegistered area
2026-12-31Latest declared completion
₹357.9 CrDeclared project cost

Is Sobha City, Phase-5 RERA approved?

Yes. It is registered with HRERA Gurugram under RERA-GRG-PROJ-701-2020, covering 5.10183 acres with 192 residential units and 6 recorded approvals.

  • Building plan approvalObtained · 2008-05-27
  • AAI height clearanceObtained · 2008-05-27
  • Environment clearanceObtained · 2008-05-27
  • Fire scheme approvalObtained · 2008-05-27
  • Consent to establishObtained · 2008-05-27
  • Occupancy certificateObtained · 2008-05-27

Source: HRERA Gurugram registration certificate RERA-GRG-PROJ-701-2020.

When is possession at Sobha City, Phase-5?

The record gives one declared completion date: Dec 2026. A declared date is what the promoter filed, not proof of delivery.

Dec 2026
weakest
Marketing / listing material · also in The promoter's own RERA filing

None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery.

Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.

What is the price of Sobha City, Phase-5?

Publicly listed at On request — contact developer / RERA-registered sales office for 192. No dated, unit-specific price list was sourced against this registration, so treat the band as indicative rather than an offer.

Amenities on record

  • 24x7 Security with CCTV
  • Power Backup
  • High-Speed Passenger Lifts
  • Landscaped Gardens
  • Swimming Pool
  • Gymnasium
  • Clubhouse
  • Children's Play Area
  • Jogging Track
  • Indoor Games Room
  • Multipurpose Hall
  • Ample Visitor Parking
  • Rainwater Harvesting
  • Fire Safety System

Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.

Who is the developer of Sobha City, Phase-5?

The promoter on record is Sobha Limited, marketed as Sobha Limited, registered at Sarjapur-Marathahalli Outer Ring Road, Devarabisanahalli, Bellandur Post, Bangalore, KA 560103. The declared project cost is 357.9 Cr.

Construction ₹141.2 CrInfrastructure ₹4.4 CrLand ₹134.5 CrNot attributed to a head ₹77.8 Cr
Construction141.2 Cr39%
Infrastructure4.4 Cr1%
Land134.5 Cr38%
Not attributed to a head77.8 Cr22%
Declared total357.9 Cr100%

77.8 Cr of the declared cost is not attributed to any named head — that is 22% of the project with no breakdown anywhere in the filing.

See all RERA projects by Sobha

The RERA escrow account is Standard Chartered Bank, A/c 45505398819, IFSC SCBL0036073. Seventy per cent of buyer collections must sit there — payments made outside it are outside the RERA protection.

Source: the authority's promoter disclosure and the filed financial schedule.

What do the approved plans for Sobha City, Phase-5 show?

The layout, floor plans and elevations as filed. Every sheet below is rendered from a document the promoter lodged with HRERA Gurugram, and opens to the original upload — nothing here is a brochure render.

Source: the 14 documents filed under this registration.

Is it safe to buy in Sobha City, Phase-5?

The registration itself is sound — identity, scope and phase all check out. 3 things are still open. Resolve that before you pay.

No project-wide delivery inference
No phase-wide OC/CC or current-offer conclusion is established.
No current offer conclusion
The reviewed record does not establish current stock, price, title conclusion or unit-level availability for Sobha City, Phase-5.
Broader township plans are not Phase-5 proof
Most plan and approval uploads concern the approximately 39.375-acre township and do not isolate the 5.10183-acre C5/C6 phase.

Source: Site Setu agent-reviewed dossier, 2026-08-02. Record-quality assessment, not investment advice.

The verified record behind this page

Every figure above comes from a document filed with HRERA Gurugram. This is the audit that produced them — 5 dimensions assessed, every fact carrying its own confidence.

Record review

Agent-reviewed 2026-08-02 · 7 facts checked · 5 dimensions

Identity
Supported
Exact project/phase
Promoter
Supported
Recorded promoter
Dates
Needs a look
Programme boundary
Occupancy/offer
Not sourced
Limited
Document-content audit
Not sourced
Exact certificate, broader plan set
Registration
Rera-Grg-Proj-701-2020
medium
Promoter
Sobha Limited
medium
Exact phase/scope
Sobha City Phase 5, C5/C6 context, 192 units at Babupur/Sector 108.
medium
Date boundary
Start 2020-06-15; certificate-era commitment completion 2026-12-31 after HRERA hearing concern on longer licence-derived timeline.
medium
Occupancy/current offer
No phase-wide OC/CC or current-offer conclusion is established.
not-found
Location
Revenue Estate of Babupur Village, Sector-108, Gurugram, Haryana
medium
Authority
Haryana RERA/HRERA Gurugram record
medium
How this review was done, and what it excluded
Authority
HRERA Gurugram
Registration
RERA-GRG-PROJ-701-2020
Documents seen
4 drawing sets, 10 authority documents
3D reconstruction
Not built
Not established
Occupancy certificate, current construction progress, live inventory, dated unit-level offer

Source: Canonical project record and completed visual document-content audit

The same filings, as a working project plan

A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.

Sobha City, Phase-5Demo · read only

Overview

Sobha City, Phase-5 · Sector 108, Gurgaon

From the RERA filing
₹357.9 Cr
Declared cost
192 units
5.10183 ac
Registered area
FAR 0.21131
6
Approvals on file
of 6 typical
14
Documents on file
plans, approvals, legal

Record timeline

  1. Dec 2026Marketing possession claimweakest

Project card

Promoter
Sobha Limited
Registration
RERA-GRG-PROJ-701-2020
Authority
HRERA Gurugram
Towers
9
Units
192
Escrow
Standard Chartered Bank

This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.

Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.

Other registered projects nearby

Same corridor, same authority. Compared on what is filed, not on what is advertised.

ProjectPromoterPricePossession
Sobha City, Phase-5Sobha LimitedOn request — contact developer / RERA-registered sales office
SOBHA AltusSobha LimitedRs 6.5 Cr onwardsApril 2028
Sobha Sector 63ASobha LimitedPremium Luxury2029
Sobha International CitySobha LimitedUltra-Luxury2028
Smartworld The EditionSmartworld DevelopersOn request
Sobha StradaSOBHA COMMERCIAL PRIVATE LIMITEDOn request