Sobha City, Phase-5 (RERA RERA-GRG-PROJ-701-2020): price, possession and the verified record
Sobha City, Phase-5 is a 5.10183-acre, 192-unit 192 project by Sobha Limited at Revenue Estate of Babupur Village, Sector-108, Gurugram, Haryana, registered with HRERA Gurugram as RERA-GRG-PROJ-701-2020 and listed at On request — contact developer / RERA-registered sales office.

Are you the builder of Sobha City, Phase-5?
BOQ from your drawings for your next project: an item-wise Excel BOQ with IS 1200 measurement sheets, from ₹2,500 for a house up to about 1,500 sq ft (larger projects priced from your drawings). Final quote after we see your drawings.
Get a BOQ quote on WhatsAppMonthly billing desk: your measurement book, one RA bill and BBS every month, from ₹7,500 a month per site. Setup BOQ and BBS quoted separately.
Ask about billing on WhatsAppSiteSetu is an independent BOQ and billing service, not affiliated with this project's builder or any RERA authority.
Is Sobha City, Phase-5 RERA approved?
Yes. It is registered with HRERA Gurugram under RERA-GRG-PROJ-701-2020, covering 5.10183 acres with 192 residential units and 6 recorded approvals.
- Building plan approvalObtained · 2008-05-27
- AAI height clearanceObtained · 2008-05-27
- Environment clearanceObtained · 2008-05-27
- Fire scheme approvalObtained · 2008-05-27
- Consent to establishObtained · 2008-05-27
- Occupancy certificateObtained · 2008-05-27
Source: HRERA Gurugram registration certificate RERA-GRG-PROJ-701-2020.
When is possession at Sobha City, Phase-5?
The record gives one declared completion date: Dec 2026. A declared date is what the promoter filed, not proof of delivery.
None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery.
Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.
What is the price of Sobha City, Phase-5?
Publicly listed at On request — contact developer / RERA-registered sales office for 192. No dated, unit-specific price list was sourced against this registration, so treat the band as indicative rather than an offer.
Amenities on record
- 24x7 Security with CCTV
- Power Backup
- High-Speed Passenger Lifts
- Landscaped Gardens
- Swimming Pool
- Gymnasium
- Clubhouse
- Children's Play Area
- Jogging Track
- Indoor Games Room
- Multipurpose Hall
- Ample Visitor Parking
- Rainwater Harvesting
- Fire Safety System
Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.
Who is the developer of Sobha City, Phase-5?
The promoter on record is Sobha Limited, marketed as Sobha Limited, registered at Sarjapur-Marathahalli Outer Ring Road, Devarabisanahalli, Bellandur Post, Bangalore, KA 560103. The declared project cost is ₹357.9 Cr.
₹77.8 Cr of the declared cost is not attributed to any named head — that is 22% of the project with no breakdown anywhere in the filing.
See all RERA projects by Sobha
The RERA escrow account is Standard Chartered Bank, A/c 45505398819, IFSC SCBL0036073. Seventy per cent of buyer collections must sit there — payments made outside it are outside the RERA protection.
Source: the authority's promoter disclosure and the filed financial schedule.
What do the approved plans for Sobha City, Phase-5 show?
The layout, floor plans and elevations as filed. Every sheet below is rendered from a document the promoter lodged with HRERA Gurugram, and opens to the original upload — nothing here is a brochure render.
Source: the 14 documents filed under this registration.
Is it safe to buy in Sobha City, Phase-5?
The registration itself is sound — identity, scope and phase all check out. 3 things are still open. Resolve that before you pay.
Source: SiteSetu agent-reviewed dossier, 2026-08-02. Record-quality assessment, not investment advice.
The verified record behind this page
Every figure above comes from a document filed with HRERA Gurugram. This is the audit that produced them — 5 dimensions assessed, every fact carrying its own confidence.
Record review
Agent-reviewed 2026-08-02 · 7 facts checked · 5 dimensions
- Registration
- Rera-Grg-Proj-701-2020
- medium
- Promoter
- Sobha Limited
- medium
- Exact phase/scope
- Sobha City Phase 5, C5/C6 context, 192 units at Babupur/Sector 108.
- medium
- Date boundary
- Start 2020-06-15; certificate-era commitment completion 2026-12-31 after HRERA hearing concern on longer licence-derived timeline.
- medium
- Occupancy/current offer
- No phase-wide OC/CC or current-offer conclusion is established.
- not-found
- Location
- Revenue Estate of Babupur Village, Sector-108, Gurugram, Haryana
- medium
- Authority
- Haryana RERA/HRERA Gurugram record
- medium
▸ How this review was done, and what it excluded
- Authority
- HRERA Gurugram
- Registration
- RERA-GRG-PROJ-701-2020
- Documents seen
- 4 drawing sets, 10 authority documents
- 3D reconstruction
- Not built
- Not established
- Occupancy certificate, current construction progress, live inventory, dated unit-level offer
Source: Canonical project record and completed visual document-content audit
The same filings, as a working project plan
A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live SiteSetu workspace, with nothing added.
Overview
Sobha City, Phase-5 · Sector 108, Gurgaon
Record timeline
- Dec 2026Marketing possession claimweakest
Project card
- Promoter
- Sobha Limited
- Registration
- RERA-GRG-PROJ-701-2020
- Authority
- HRERA Gurugram
- Towers
- 9
- Units
- 192
- Escrow
- Standard Chartered Bank
This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.
Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.
Other registered projects nearby
Same corridor, same authority. Compared on what is filed, not on what is advertised.
| Project | Promoter | Price | Possession |
|---|---|---|---|
| Sobha City, Phase-5 | Sobha Limited | On request — contact developer / RERA-registered sales office | — |
| SOBHA Altus | Sobha Limited | Rs 6.5 Cr onwards | April 2028 |
| Sobha Sector 63A | Sobha Limited | Premium Luxury | 2029 |
| Sobha International City | Sobha Limited | Ultra-Luxury | 2028 |
| Smartworld The Edition | Smartworld Developers | On request | — |
| Sobha Strada | SOBHA COMMERCIAL PRIVATE LIMITED | On request | — |