Skip to main content

BOQ for a pile foundation

A pile foundation BOQ starts with an exact pile count and length, then the concrete, the reinforcement cages, the pile caps and the tie beams. Most disputes come from the count and from what length is paid: cut-off level, founding level, and the empty bore above the cut-off. We trace every pile to its group on the plan and state the length basis on the BOQ.

What to send us

  • Pile layout with grids and pile group types
  • Pile details: diameter, length or founding level, cut-off level, reinforcement
  • Pile cap and tie beam details
  • Soil report or pile design notes, if available

PDF or CAD (DWG) both work. If something is missing, we tell you what it changes and state the assumption in the BOQ instead of guessing silently.

What the pile foundation BOQ covers

PilingMobilisation (lump sum), boring by diameter (running metres), empty bore (running metres)
ConcreteConcrete in piles (m³), pile caps and tie beams (m³), PCC under caps (m³)
SteelCage reinforcement and cap steel (kg)
Other itemsChipping pile heads (numbers), disposal of bore spoil (m³), pile load tests (numbers)

Every quantity comes with its L×B×D measurement sheet, so you can check any line against the drawing. See the sample BOQ for the format.

Piling we have measured

Bored piles for a building foundation

158 piles of 300 mm diameter, 5 m long (790 m of piling) and 8,059 kg of steel, with bar diameters and spacings measured from the drawn details

Shoring for a Mumbai tower basement

253 shoring piles counted from the shoring design

On the first job, the client's instruction (four-pile groups on two grid lines) could be read two ways, giving 158 or 152 piles. We billed his wording and asked him before finalising.

What usually goes wrong in a pile foundation estimate

  • Unclear pile groups on the plan. Grid labels and group types must be matched pile by pile, or the count drifts.
  • Length basis not stated. Is the pile paid from cut-off to founding level, or from ground level? The empty bore above cut-off is a separate item in most contracts.
  • Concrete over-consumption in bored piles not allowed for in the estimate.
  • Pile load tests and chipping of pile heads left out.

Price

Quoted after we see your drawings, by size and scope. Before you order, you see a sample from a similar real job, and your first project is 50% off, up to ₹5,000.

See what BOQ preparation costs by project size.

Get a quote for your pile foundation

Share your drawings and contact details. We confirm the scope and price on WhatsApp before any work begins, and share a sample from a similar real job.

How will you share the drawings? *

PDF or DWG, several files allowed, up to 4 MB in total.

Helps us size the quote (optional)

More details (optional)

We reply on WhatsApp within working hours. Your drawings stay confidential and are used only to prepare your BOQ.

Frequently asked questions

How is pile length measured in a BOQ?

Usually from the cut-off level to the founding level for the pile itself, with the empty bore above cut-off as a separate running-metre item. Your contract decides, so we state the basis on the BOQ.

Can you measure piles without a pile schedule?

Yes, from the layout and a typical pile detail, as long as group types are marked. Anything we have to assume, such as length, is listed as an assumption.

How long does a pile foundation BOQ take?

Usually under 48 hours, depending on project complexity and scope. We confirm scope and timing on WhatsApp after seeing the drawings.

How much does a pile foundation BOQ cost?

Quoted after we see your drawings, by size and scope. Before you order, you see a sample from a similar real job, and your first project is 50% off, up to ₹5,000.