Skip to main content
This page is unclaimed. Built from 12 of ACE Group’s filings. No promoter has verified it.

ACE Acreville (RERA UPRERAPRJ248777/03/2025): price, possession and the verified record

ACE Acreville is a 100.04-acre, 886-unit Residential Plots project by ACE Group at Sector 22A, Yamuna Expressway, Greater Noida, registered with UP RERA as UPRERAPRJ248777/03/2025 and listed at Premium plots. Possession is the one thing the record does not agree on: the promoter’s own filing declares 31 Mar 2026, the authority’s current record shows Mar 2026, and marketing says 2027.

No conflicts foundResidential Plots12 approved documentsReviewed 2026-07-30
Premium plotsPrice band
886Units registered
100.04 acRegistered area
Mar 2026Latest declared completion3 sources disagree
₹595.1 CrDeclared project cost

Is ACE Acreville RERA approved?

Yes. It is registered with UP RERA under UPRERAPRJ248777/03/2025, covering 100.04 acres with 886 residential units and 6 recorded approvals.

  • Building plan approval
  • AAI height clearance
  • Environment clearance
  • Fire scheme approval
  • Consent to establish
  • Occupancy certificate

Source: UP RERA registration certificate UPRERAPRJ248777/03/2025.

When is possession at ACE Acreville?

There are 3 different dates on record. The promoter committed to 31 Mar 2026 in its own RERA filing. The authority’s current public record shows Mar 2026. Marketing says 2027.

31 Mar 2026
binding
Declared completion
Filed date, not a current delivery or possession conclusion.
Mar 2026
binding
The promoter's own RERA filing
Declared by the promoter in Form REP-I — the strongest commitment on record.
2027
weakest
Marketing / listing material

None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery. What to ask for: Obtain the latest UP-RERA QPR and any approved revised completion date before relying on delivery timing.

Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.

What is the price of ACE Acreville?

Publicly listed at Premium plots for Residential Plots. No dated, unit-specific price list was sourced against this registration, so treat the band as indicative rather than an offer.

Amenities on record

  • 24x7 Security with CCTV
  • Power Backup
  • High-Speed Passenger Lifts
  • Landscaped Gardens
  • Swimming Pool
  • Gymnasium
  • Clubhouse
  • Children's Play Area
  • Jogging Track
  • Indoor Games Room
  • Multipurpose Hall
  • Ample Visitor Parking
  • Rainwater Harvesting
  • Fire Safety System

Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.

Who is the developer of ACE Acreville?

The promoter on record is Three C Homes Pvt. Ltd., marketed as ACE Group, registered at 63, 3rd Floor, Poorvi Marg, Vasant Vihar Phase-1, New Delhi 110057. The declared project cost is ₹595.1 Cr.

Land ₹440.1 CrNot attributed to a head ₹155 Cr
Land₹440.1 Cr74%
Not attributed to a head₹155 Cr26%
Declared total₹595.1 Cr100%

₹155 Cr of the declared cost is not attributed to any named head — that is 26% of the project with no breakdown anywhere in the filing.

See all RERA projects by ACE Group

Source: the authority's promoter disclosure and the filed financial schedule.

Is it safe to buy in ACE Acreville?

The registration itself is sound — identity, scope and phase all check out. 2 things are still open. Resolve that before you pay.

Completion field requires fresh evidence
The 2025 registration documents record zero construction yet contain a March 2026 declared date; no current QPR or approved revision was reviewed.
What to ask for: Obtain the latest UP-RERA QPR and any approved revised completion date before relying on delivery timing.
Tenure and promoter should be read in the contract
The legal promoter is Three C Homes and the tenure is leasehold/sub-lease; ACE branding does not alter either contractual point.
What to ask for: Have the allotment/agreement and YEIDA sub-lease terms checked for the selected plot.

Source: Site Setu agent-reviewed dossier, 2026-07-30. Record-quality assessment, not investment advice.

The verified record behind this page

Every figure above comes from a document filed with UP RERA. This is the audit that produced them — 4 dimensions assessed, every fact carrying its own confidence.

Record review

Agent-reviewed 2026-07-30 · 6 facts checked · 4 dimensions

Identity
Supported
Legal promoter retained despite ACE branding
Scope
Supported
Form-Q supports 886 plots
Tenure
Needs a look
Leasehold structure is material
Timeline
Needs a look
March 2026 field needs current confirmation
UP-RERA registration
Upreraprj248777/03/2025Local application and project-summary records identify the registration dated 7 March 2025.
high
Legal promoter
Three C Homes Pvt. Ltd.ACE Group is marketing and resolution-plan context; it is not substituted for the RERA promoter.
high
Registered plot count
886 plotsForm-Q architect certificate provides the primary count; marketing 365-plot figures are excluded as narrower context.
high
Operative plan extent
404,860.60 sq m (about 100.04 acres)Sanction-plan extent differs from lease-deed and lease-plan figures and is retained as the operative registered-area context.
high
Tenure
YEIDA leasehold/sub-lease modelLocal conveyance/sub-lease documents do not support describing the plots as stated freehold.
high
Declared completion and current offer
31 March 2026 filed date; current status not establishedRegistration-era documents show 0% construction; no later QPR, revised date, inventory or dated offer was reviewed.
stale
▸ How this review was done, and what it excluded
Authority
UP RERA
Registration
UPRERAPRJ248777/03/2025
Documents seen
0 drawing sets, 12 authority documents
3D reconstruction
Not built
Not established
Occupancy certificate, current construction progress, live inventory, dated unit-level offer

Source: Local UP-RERA application, Form-Q/Form-3, sanctioned layout and YEIDA documents

The same filings, as a working project plan

A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.

ACE AcrevilleDemo · read only

Overview

ACE Acreville · Sector 22A, Noida

From the RERA filing
₹595.1 Cr
Declared cost
886 units
100.04 ac
Registered area
6
Approvals on file
of 6 typical
12
Documents on file
plans, approvals, legal
Mar 2026
Completion
disputed · 3 sources
Completion date is unresolved. The promoter’s own filing declares 31 Mar 2026, the authority’s public record shows Mar 2026 and marketing material says 2027. Nothing in the reviewed filings explains the change. In a live workspace this would sit as a blocking issue against the handover milestone, with an owner and a due date.

Record timeline

  1. 31 Mar 2026Declared completionFiled date, not a current delivery or possession conclusion.
  2. Mar 2026The promoter's own RERA filingDeclared by the promoter in Form REP-I — the strongest commitment on record.
  3. 2027Marketing possession claimweakest

Project card

Promoter
Three C Homes Pvt. Ltd.
Registration
UPRERAPRJ248777/03/2025
Authority
UP RERA
Units
886

This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.

Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.

Other registered projects nearby

Same corridor, same authority. Compared on what is filed, not on what is advertised.

ProjectPromoterPricePossession
ACE AcrevilleACE GroupPremium plotsMar 2026
ACE EditACE GroupStarting from Rs 86 Lakh onwardsApril 2029
ACE VerdeACE GroupPremium segment2028
ACE 153ACE GroupPremium segment2027
ACE YXPACE GroupAffordable luxury2027
ACE ParkwayACE GroupLuxury segment2026