Dynasty By ORO (RERA UPRERAPRJ469558/12/2024): price, possession and the verified record

Dynasty By ORO is a project by ORO Group at Khasra 784P, 790P, 791P and 792 Kha P, Lucknow, registered with Uttar Pradesh Real Estate Regulatory Authority (UP RERA) as UPRERAPRJ469558/12/2024.

No conflicts found0 approved documentsReviewed 2026-07-31
On requestPrice band
Units registered
Registered area
2031-06-14Latest declared completion
Declared project cost

Is Dynasty By ORO RERA approved?

Yes. It is registered with Uttar Pradesh Real Estate Regulatory Authority (UP RERA) under UPRERAPRJ469558/12/2024 and 0 recorded approvals.

  • Building plan approvalNot in the reviewed filing
  • AAI height clearanceNot in the reviewed filing
  • Environment clearanceNot in the reviewed filing
  • Fire scheme approvalNot in the reviewed filing
  • Consent to establishNot in the reviewed filing
  • Occupancy certificateNot expected until completion

Source: Uttar Pradesh Real Estate Regulatory Authority (UP RERA) registration certificate UPRERAPRJ469558/12/2024.

When is possession at Dynasty By ORO?

The record gives one declared completion date: Jun 2031. A declared date is what the promoter filed, not proof of delivery.

Jun 2031
weakest
Marketing / listing material · also in The promoter's own RERA filing, Declared completion target

None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery.

Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.

What is the price of Dynasty By ORO?

No price is published against this registration. Any figure you are shown should be confirmed in writing against RERA number UPRERAPRJ469558/12/2024.

Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.

Who is the developer of Dynasty By ORO?

The promoter on record is ORO Real Infra LLP, marketed as ORO Group.

Source: the authority's promoter disclosure and the filed financial schedule.

Is it safe to buy in Dynasty By ORO?

The registration itself is sound — identity, scope and phase all check out. 1 thing is still open. Resolve that before you pay.

The April 2025 proposed start and June 2031 target are schedule entries, not independently observed construction milestones
The April 2025 proposed start and June 2031 target are schedule entries, not independently observed construction milestones.
What to ask for: Use later UP RERA amendments to refine the phase label and review current progress before assigning a construction state.

Source: Site Setu agent-reviewed dossier, 2026-07-31. Record-quality assessment, not investment advice.

The verified record behind this page

Every figure above comes from a document filed with Uttar Pradesh Real Estate Regulatory Authority (UP RERA). This is the audit that produced them — 2 dimensions assessed, every fact carrying its own confidence.

Record review

Agent-reviewed 2026-07-31 · 3 facts checked · 2 dimensions

Identity and phase
Supported
Registration-scoped identity
Timeline and current lifecycle
Not sourced
Current lifecycle not safely resolved
Registered identity
Dynasty By ORO — UPRERAPRJ469558/12/2024This page is limited to Phase 2 as identified in the authority-hosted agreement; marketed names and aliases do not create additional registrations.
high
Promoter and location
ORO Real Infra LLP; Khasra 784P, 790P, 791P and 792 Kha P, LucknowThe legal promoter is kept distinct from the consumer-facing developer or brand where those names differ.
high
Registered or reported scope
high-rise apartmentsOnly scope supported by the cited evidence is shown; no price, availability, amenity delivery or wider parent total is inferred.
medium
How this review was done, and what it excluded
Authority
Uttar Pradesh Real Estate Regulatory Authority (UP RERA)
Registration
UPRERAPRJ469558/12/2024
Documents seen
0 drawing sets, 0 authority documents
3D reconstruction
Not built
Not established
Occupancy certificate, current construction progress, live inventory, dated unit-level offer

Source: UP RERA

The same filings, as a working project plan

A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.

Dynasty By ORODemo · read only

Overview

Dynasty By ORO

From the RERA filing
0
Approvals on file
of 6 typical
0
Documents on file
plans, approvals, legal

Record timeline

  1. Jun 2031Marketing possession claimweakest

Project card

Promoter
ORO Real Infra LLP
Registration
UPRERAPRJ469558/12/2024
Authority
Uttar Pradesh Real Estate Regulatory Authority (UP RERA)

This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.

Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.

Other registered projects nearby

Same corridor, same authority. Compared on what is filed, not on what is advertised.

ProjectPromoterPricePossession
Dynasty By OROORO GroupOn request
ORO ConstellaORO GroupOn request2028-02-12
Eldeco Akaar-Sakaar at Eldeco ImperiaEldeco GroupOn request2028-09-24
Ansal Sushant Golf City Misty HomesAnsal API30.65 Lakh - 45.48 Lakh (2 BHK; resale/on-listing varies)
Eldeco EleganceEldeco Group83.36L - 1.86Cr (original launch); Resale 65L - 2.25Cr
Ansal Sushant Golf CityAnsal API18L - 2.5Cr+