SOBHA ORION BLOCK 03 (RERA P52100002044): price, possession and the verified record

SOBHA ORION BLOCK 03 is a 3.916-acre, 00 project by SOBHA LTD. at kondhwa BK, registered with MahaRERA as P52100002044 and listed at On request — contact developer / RERA-registered sales office.

No conflicts found00 approved documentsReviewed 2026-07-30
On request — contact developer / RERA-registered sales officePrice band
—Units registered
3.916 acRegistered area
2018-04-30Latest declared completion
—Declared project cost

Is SOBHA ORION BLOCK 03 RERA approved?

Yes. It is registered with MahaRERA under P52100002044, covering 3.916 acres0 and 6 recorded approvals.

  • Building plan approval
  • AAI height clearance
  • Environment clearance
  • Fire scheme approval
  • Consent to establish
  • Occupancy certificate

Source: MahaRERA registration certificate P52100002044.

When is possession at SOBHA ORION BLOCK 03?

The record gives one declared completion date: Apr 2018. A declared date is what the promoter filed, not proof of delivery.

Apr 2018
weakest
Marketing / listing material · also in The promoter's own RERA filing, Declared completion

None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery.

Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.

What is the price of SOBHA ORION BLOCK 03?

Publicly listed at On request — contact developer / RERA-registered sales office for 0. No dated, unit-specific price list was sourced against this registration, so treat the band as indicative rather than an offer.

Amenities on record

  • 24x7 Security with CCTV
  • Power Backup
  • High-Speed Passenger Lifts
  • Landscaped Gardens
  • Swimming Pool
  • Gymnasium
  • Clubhouse
  • Children's Play Area
  • Jogging Track
  • Indoor Games Room
  • Multipurpose Hall
  • Ample Visitor Parking
  • Rainwater Harvesting
  • Fire Safety System

Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.

Who is the developer of SOBHA ORION BLOCK 03?

The promoter on record is Sobha Ltd., marketed as SOBHA LTD..

Source: the authority's promoter disclosure and the filed financial schedule.

Is it safe to buy in SOBHA ORION BLOCK 03?

The registration itself is sound — identity, scope and phase all check out. 2 things are still open. Resolve that before you pay.

Block-only OC boundary
Confirm the final OC’s number, date and building/floor scope before applying it beyond Block 03.
No live offer conclusion
Completed status and an OC-labelled file do not establish current inventory or pricing.

Source: Site Setu agent-reviewed dossier, 2026-07-30. Record-quality assessment, not investment advice.

The verified record behind this page

Every figure above comes from a document filed with MahaRERA. This is the audit that produced them — 4 dimensions assessed, every fact carrying its own confidence.

Record review

Agent-reviewed 2026-07-30 · 6 facts checked · 4 dimensions

Block identity
Supported
Supported
OC trail
Needs a look
Document indexed
Residential scope
Supported
Supported
Current offer
Not sourced
Limited
Promoter
SOBHA LTD. is the company named as promoter.
high
Block scope
The registration covers one SOBHA ORION BLOCK 03 building with 16 sanctioned floors.
high
Location
The project land is recorded at the listed Survey No. 19 parcels in Kondhwa BK, Haveli, Pune.
high
Apartment schedule
The retained schedule lists 1BHK and 2BHK Block 03 apartment types; it is not a current availability table.
high
Timeline
Registration is dated 2017-07-31 and original completion is 2018-04-30.
high
OC and offer boundary
A file labelled Sobha Orion Final OC.pdf is indexed, but its certificate detail was not independently extracted; no current price or live availability was established.
not-found
▸ How this review was done, and what it excluded
Authority
MahaRERA
Registration
P52100002044
Documents seen
0 drawing sets, 0 authority documents
3D reconstruction
Not built
Not established
Occupancy certificate, current construction progress, live inventory, dated unit-level offer

Source: MahaRERA public project record and retained Block 03 OC upload

The same filings, as a working project plan

A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.

SOBHA ORION BLOCK 03Demo · read only

Overview

SOBHA ORION BLOCK 03

From the RERA filing
3.916 ac
Registered area
6
Approvals on file
of 6 typical
0
Documents on file
plans, approvals, legal

Record timeline

  1. Apr 2018Marketing possession claimweakest

Project card

Promoter
Sobha Ltd.
Registration
P52100002044
Authority
MahaRERA
Towers
1

This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.

Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.

Other registered projects nearby

Same corridor, same authority. Compared on what is filed, not on what is advertised.

ProjectPromoterPricePossession
SOBHA ORION BLOCK 03SOBHA LTD.On request — contact developer / RERA-registered sales office—
Sun Valley by BramhaCorp - Phase 1BramhaCorpOn request—
SHRUTI PRESTIGE B WINGM/S. SHRUTI DEVELOPERSOn request — contact developer / RERA-registered sales office2018-03-31
Suvastu PrestigeSavastu BuildconOn request — contact developer / RERA-registered sales office2025-12-31
SHIVKRUPA PRESTIGESHIVKRUPA CONSTRUCTIONOn request — contact developer / RERA-registered sales office2023-12-30
T7 named Belvedere phase 3 of Raheja Reserve being buildings T7 T8 T9 T10 in RV PremiereCavalcade Properties Private LimitedOn request — contact developer / RERA-registered sales office2025-03-31