LALBAG PRESTIGE BUILDING B (RERA P52100010952): price, possession and the verified record
LALBAG PRESTIGE BUILDING B is a 1.236-acre, 031 project by RELIABLE CONSTRUCTION at MANCHAR, registered with MahaRERA as P52100010952 and listed at On request — contact developer / RERA-registered sales office.
Is LALBAG PRESTIGE BUILDING B RERA approved?
Yes. It is registered with MahaRERA under P52100010952, covering 1.236 acres0 and 6 recorded approvals.
- Building plan approval
- AAI height clearance
- Environment clearance
- Fire scheme approval
- Consent to establish
- Occupancy certificate
Source: MahaRERA registration certificate P52100010952.
When is possession at LALBAG PRESTIGE BUILDING B?
The record gives one declared completion date: Dec 2021. A declared date is what the promoter filed, not proof of delivery.
None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery.
Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.
What is the price of LALBAG PRESTIGE BUILDING B?
Publicly listed at On request — contact developer / RERA-registered sales office for 31. No dated, unit-specific price list was sourced against this registration, so treat the band as indicative rather than an offer.
Amenities on record
- 24x7 Security with CCTV
- Power Backup
- High-Speed Passenger Lifts
- Landscaped Gardens
- Swimming Pool
- Gymnasium
- Clubhouse
- Children's Play Area
- Jogging Track
- Indoor Games Room
- Multipurpose Hall
- Ample Visitor Parking
- Rainwater Harvesting
- Fire Safety System
Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.
Who is the developer of LALBAG PRESTIGE BUILDING B?
The promoter on record is Reliable Construction, marketed as RELIABLE CONSTRUCTION.
Source: the authority's promoter disclosure and the filed financial schedule.
Is it safe to buy in LALBAG PRESTIGE BUILDING B?
The registration itself is sound — identity, scope and phase all check out. 2 things are still open. Resolve that before you pay.
Source: Site Setu agent-reviewed dossier, 2026-07-30. Record-quality assessment, not investment advice.
The verified record behind this page
Every figure above comes from a document filed with MahaRERA. This is the audit that produced them — 4 dimensions assessed, every fact carrying its own confidence.
Record review
Agent-reviewed 2026-07-30 · 6 facts checked · 4 dimensions
- Registration and promoter
- P52100010952; Reliable ConstructionThe retrieved public view identifies the record, promoter and Completed status.
- high
- Registered scope
- One Building B; seven sanctioned floorsThe authority building table names only BUILDING B and records seven sanctioned floors.
- high
- Public apartment schedule
- 31 listed apartmentsThe authority table's ten Building B rows total 31 apartments. This is not a current seller inventory.
- high
- Configuration schedule
- 23 1BHK, 2 1.5BHK and 6 2BHK entriesThese figures aggregate the table's area-specific rows; no current configuration offer or availability was reviewed.
- high
- Timeline
- Original 31 December 2019; revised 30 December 2021The public timeline contains both dates. Neither substitutes for certificate-content review.
- high
- Plan and Form 2 scope
- Combined A+B drawing; 2021 Form 2 file indexedThe drawing review identifies a scheme-wide A+B 100-tenement plan figure, and the index lists a Building-B Form 2 file. Neither is used as proof of a current close-out outcome.
- medium
▸ How this review was done, and what it excluded
- Authority
- MahaRERA
- Registration
- P52100010952
- Documents seen
- 0 drawing sets, 0 authority documents
- 3D reconstruction
- Not built
- Not established
- Occupancy certificate, current construction progress, live inventory, dated unit-level offer
Source: MahaRERA public-view project bundle, captured 22 April 2026, and indexed registration, plan and certificate records
The same filings, as a working project plan
A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.
Overview
LALBAG PRESTIGE BUILDING B
Record timeline
- 30 Dec 2021Revised completion dateThis filed revised date is distinct from an independently reviewed close-out certificate.
- Dec 2021Marketing possession claimweakest
Project card
- Promoter
- Reliable Construction
- Registration
- P52100010952
- Authority
- MahaRERA
- Towers
- 1
This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.
Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.
Other registered projects nearby
Same corridor, same authority. Compared on what is filed, not on what is advertised.
| Project | Promoter | Price | Possession |
|---|---|---|---|
| LALBAG PRESTIGE BUILDING B | RELIABLE CONSTRUCTION | On request — contact developer / RERA-registered sales office | 30 Dec 2021 |
| Life Republic Township | Kolte-Patil Developers | 3600000 - 25000000 | — |
| KUMAR VISTA | BINOD KUMAR RAI | On request — contact developer / RERA-registered sales office | 2018-11-30 |
| Lodha Bella Vita | Lodha Group | 10000000 - 29000000 | — |
| KUMAR SELENA A BUILDING | Kumar Construction and Properties Pvt Ltd | On request — contact developer / RERA-registered sales office | 2024-12-30 |
| Lodha Belmondo | Lodha Group | 6000000 - 14200000 | — |