Marbella Terraces (RERA RERA-GRG-2228-2026): price, possession and the verified record
Marbella Terraces is a project by EMAAR INDIA LIMITED at Sector 66, Gurugram, registered with Haryana Real Estate Regulatory Authority, Gurugram as RERA-GRG-2228-2026.

Are you the builder of Marbella Terraces?
BOQ from your drawings for your next project: an item-wise Excel BOQ with IS 1200 measurement sheets, from ₹2,500 for a house up to about 1,500 sq ft (larger projects priced from your drawings). Final quote after we see your drawings.
Get a BOQ quote on WhatsAppMonthly billing desk: your measurement book, one RA bill and BBS every month, from ₹7,500 a month per site. Setup BOQ and BBS quoted separately.
Ask about billing on WhatsAppSiteSetu is an independent BOQ and billing service, not affiliated with this project's builder or any RERA authority.
Is Marbella Terraces RERA approved?
Yes. It is registered with Haryana Real Estate Regulatory Authority, Gurugram under RERA-GRG-2228-2026 and 0 recorded approvals.
- Building plan approvalNot in the reviewed filing
- AAI height clearanceNot in the reviewed filing
- Environment clearanceNot in the reviewed filing
- Fire scheme approvalNot in the reviewed filing
- Consent to establishNot in the reviewed filing
- Occupancy certificateNot expected until completion
Source: Haryana Real Estate Regulatory Authority, Gurugram registration certificate RERA-GRG-2228-2026.
What is the price of Marbella Terraces?
No price is published against this registration. Any figure you are shown should be confirmed in writing against RERA number RERA-GRG-2228-2026.
Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.
Who is the developer of Marbella Terraces?
The promoter on record is Emaar India Limited, marketed as EMAAR INDIA LIMITED.
Source: the authority's promoter disclosure and the filed financial schedule.
What does Marbella Terraces look like?
1 image published by the promoter — renders, site photography and brochure material. These show how the project is being sold; the approved drawings below show what was actually sanctioned.
Source: promoter and public material, reviewed for provenance before publication. Not filed evidence.
What do the approved plans for Marbella Terraces show?
The layout, floor plans and elevations as filed. Every sheet below is rendered from a document the promoter lodged with Haryana Real Estate Regulatory Authority, Gurugram, and opens to the original upload — nothing here is a brochure render.
Source: the 5 documents filed under this registration.
What new facts were verified for Marbella Terraces?
The research pass added 3 source-backed facts without replacing the information already published. Identifier classes and registered scope are shown separately so a portal ID is never presented as the issued registration number.
- Registered project name
- MARBELLA TERRACES
- RERA filing · high confidence
- Registered location
- state: Haryana · city: Gurgaon · district: Gurugram · locality: Sector 66 · address: Sector 66, Gurugram, Haryana
- RERA filing · high confidence
- Authority project type
- Residential group housing
- RERA filing · high confidence
Source: the project claim ledger and its retained RERA or reviewed research evidence.
Is it safe to buy in Marbella Terraces?
The registration itself is sound — identity, scope and phase all check out. 2 things are still open. Resolve that before you pay.
Source: SiteSetu agent-reviewed dossier, 2026-08-02. Record-quality assessment, not investment advice.
The verified record behind this page
Every figure above comes from a document filed with Haryana Real Estate Regulatory Authority, Gurugram. This is the audit that produced them — 6 dimensions assessed, every fact carrying its own confidence.
Record review
Agent-reviewed 2026-08-02 · 8 facts checked · 6 dimensions
- Identity and timeline
- Marbella Terraces — Rera-Grg-2228-2026Sector 66; registered 2026-06-25; up to 2031-12-31.
- high
- Audited registered identity
- Marbella Terraces — Rera-Grg-2228-2026The registration-specific authority record and completed visual audit align this identity.
- high
- Legal promoter
- Emaar India LimitedThe legal promoter is retained from the registration-specific authority record.
- high
- Registered location
- Sector 66, GurugramLocation is scoped to the assigned registration and not inferred from similarly named projects.
- high
- Visual audit coverage
- 65 files / 508 pages reviewedEvery accessible page in the completed audit was visually reviewed; inaccessible records remain disclosed as limitations.
- high
- Audited verdict profile
- 27 match; 37 partial-mixed; 1 mismatch; 0 unreadable; 1 inaccessibleThese are file-content and scope verdicts, not construction or sales status.
- high
- Published audited selection
- 4 media items and 1 RERA documentOnly accessible, visually reviewed, content-accurate root records meeting the publication rules are retained.
- high
- Current delivery and availability
- Not established by the reviewed evidenceFiled plans, approvals and marketing do not prove current construction, completion, occupancy, possession, pricing or live inventory.
- not-found
▸ How this review was done, and what it excluded
- Authority
- Haryana Real Estate Regulatory Authority, Gurugram
- Registration
- RERA-GRG-2228-2026
- Documents seen
- 4 drawing sets, 1 authority documents
- 3D reconstruction
- Not built
- Not established
- Occupancy certificate, current construction progress, live inventory, dated unit-level offer
Source: Canonical project record plus completed visual document-content audit
The same filings, as a working project plan
A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live SiteSetu workspace, with nothing added.
Overview
Marbella Terraces · Sector 66, Gurgaon
Record timeline
Project card
- Promoter
- Emaar India Limited
- Registration
- RERA-GRG-2228-2026
- Authority
- Haryana Real Estate Regulatory Authority, Gurugram
This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.
Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.
Other registered projects nearby
Same corridor, same authority. Compared on what is filed, not on what is advertised.
| Project | Promoter | Price | Possession |
|---|---|---|---|
| Marbella Terraces | EMAAR INDIA LIMITED | On request | — |
| Project 2016 | EMAAR INDIA LIMITED | Rs 3.25 Cr onwards | — |
| EMAAR BUSINESS DISTRICT (EBD-89) | EMAAR INDIA LIMITED | On request | — |
| EMAAR BUSINESS DISTRICT (EBD-89 NXT) | EMAAR INDIA LIMITED | On request | — |
| EMAAR BUSINESS DISTRICT 99 (EBD 99) | EMAAR INDIA LIMITED | On request | — |
| EMAAR BUSINESS DISTRICT 99 NXT (EBD 99 NXT) | EMAAR INDIA LIMITED | On request | — |