ANANTAVILASA (RERA GGM/899/631/2025/02): price, possession and the verified record
ANANTAVILASA is a 84-unit 81 project by MNB BUILD FAB PRIVATE LIMITED at GH-26A, Sector 56, Urban Estate-II, Gurugram, Haryana, registered with HRERA Gurugram as GGM/899/631/2025/02 and listed at On Request - On Request.

Is ANANTAVILASA RERA approved?
Yes. It is registered with HRERA Gurugram under GGM/899/631/2025/02 with 84 residential units and 6 recorded approvals.
- Building plan approval
- AAI height clearance
- Environment clearance
- Fire scheme approval
- Consent to establish
- Occupancy certificate
Source: HRERA Gurugram registration certificate GGM/899/631/2025/02.
When is possession at ANANTAVILASA?
The record gives one declared completion date: Dec 2030. A declared date is what the promoter filed, not proof of delivery.
None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery.
Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.
What is the price of ANANTAVILASA?
Publicly listed at On Request - On Request for 81. No dated, unit-specific price list was sourced against this registration, so treat the band as indicative rather than an offer.
Amenities on record
- Swimming Pool
- Gymnasium (10.6 x 6.5 meters)
- Club House
- Children's Play Area
- Banquet Hall (12.6 x 11.8 meters)
- Gazebo
- Multipurpose Court (5.7 x 8.87 meters)
- Terrace Pool
- Game Zone (9.088 x 11.5 meters)
- Temple
- Entrance Lobby
- Library
- Music Room
Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.
Who is the developer of ANANTAVILASA?
The promoter on record is Mnb Build Fab Private Limited, marketed as MNB BUILD FAB PRIVATE LIMITED, registered at Shop No. 3, Ground Floor, Plot 7/25 Kirti Nagar Industrial Area, Ramesh Nagar, West Delhi 110015; Plot No. 5, Sector 43, Gurugram, Haryana.
The RERA escrow account is ICICI Bank, A/c 777705802424, IFSC ICICI0000177. Seventy per cent of buyer collections must sit there — payments made outside it are outside the RERA protection.
Source: the authority's promoter disclosure and the filed financial schedule.
What do the approved plans for ANANTAVILASA show?
The layout, floor plans and elevations as filed. Every sheet below is rendered from a document the promoter lodged with HRERA Gurugram, and opens to the original upload — nothing here is a brochure render.
Source: the 7 documents filed under this registration.
What new facts were verified for ANANTAVILASA?
The research pass added 6 source-backed facts without replacing the information already published. Identifier classes and registered scope are shown separately so a portal ID is never presented as the issued registration number.
- Registered project address
- GH26A, Sector 56, Urban Estate-II, Gurugram, Haryana
- RERA filing · high confidence
- Unique number generated online
- RERA-GRG-PROJ-1716-2024
- RERA filing · high confidence
- Portal project ID
- RERA-GRG-1716-2024
- RERA filing · high confidence
- Numeric portal record ID
- 3057
- RERA filing · high confidence
- Registered project nature
- Group Housing Colony
- RERA filing · high confidence
- Registered residential tower count
- 1
- RERA filing · high confidence
Source: the project claim ledger and its retained RERA or reviewed research evidence.
Is it safe to buy in ANANTAVILASA?
The registration itself is sound — identity, scope and phase all check out. 3 things are still open, and the completion date is the one field two authority sources disagree on. Resolve that before you pay.
Source: Site Setu agent-reviewed dossier, 2026-08-02. Record-quality assessment, not investment advice.
The verified record behind this page
Every figure above comes from a document filed with HRERA Gurugram. This is the audit that produced them — 5 dimensions assessed, every fact carrying its own confidence.
Record review
Agent-reviewed 2026-08-02 · 7 facts checked · 5 dimensions · 1 unresolved conflict
- Registration
- Ggm/899/631/2025/02Canonical HRERA Gurugram identity retained for this dossier.
- high
- Promoter
- Mnb Build Fab Private LimitedLegal promoter named in the retained record.
- high
- Tower scope
- One tower at GH-26A, Sector 56Retained record reports one tower; a current completion state is not established.
- medium
- Unit total
- Conflicting: 74 main units, 81 including service units, or 84 apartmentsThe retained project data, drawing review and marketing context do not reconcile these figures.
- conflicting
- Planning dates
- 10 October 2024 layout and building-plan approvalsRecorded planning context, not proof of current construction, completion or occupancy.
- medium
- Declared completion
- 31 December 2030Declared project date only.
- high
- Current delivery and offer
- Not establishedNo reviewed current progress, OC/CC, live inventory or dated promoter offer.
- not-found
▸ How this review was done, and what it excluded
- Authority
- HRERA Gurugram
- Registration
- GGM/899/631/2025/02
- Documents seen
- 7 drawing sets, 0 authority documents
- 3D reconstruction
- Not built
- Not established
- Occupancy certificate, current construction progress, live inventory, dated unit-level offer
Source: Canonical project record plus completed document-content audit
The same filings, as a working project plan
A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.
Overview
ANANTAVILASA · Sector 56, Gurgaon
Record timeline
- Dec 2030The promoter's own RERA filingDeclared by the promoter in Form REP-I — the strongest commitment on record.
Project card
- Promoter
- Mnb Build Fab Private Limited
- Registration
- GGM/899/631/2025/02
- Authority
- HRERA Gurugram
- Units
- 84
- Escrow
- ICICI Bank
This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.
Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.
Other registered projects nearby
Same corridor, same authority. Compared on what is filed, not on what is advertised.
| Project | Promoter | Price | Possession |
|---|---|---|---|
| ANANTAVILASA | MNB BUILD FAB PRIVATE LIMITED | On Request - On Request | Dec 2030 |
| ANANTA VILASA 2.0 | MNB BUILD FAB PRIVATE LIMITED | On request | — |
| ANANTAVILASA (GH‑26A Sector 56) | MNB Build Fab Private Limited | On request — contact developer / RERA-registered sales office | — |
| ANTARES BY ROF | ROF INFRATECH AND HOUSING PRIVATE LIMITED | On request | — |
| Anant Raj Estate (Continuation) | Anant Raj Ltd. | On request — contact developer / RERA-registered sales office | — |
| Aquaria at AIPL Lake City | FLORALESSENCE PROJECTS PRIVATE LIMITED | On request | — |