Module 6 of 10
Procurement and Cost Control
Buying right and catching leakage while it is still cheap to fix — supplier rates, landed-cost comparison, PO and GRN discipline, reconciliation, and reports that actually get read.
After this module you can
You can run a complete procurement trail from indent to reconciliation and produce a weekly cost report an owner will actually read.
- 6.1 The Procurement Cycle on a Residential ProjectMost residential sites buy material on phone calls and memory. Here is the eight-step paper trail that stops leakage — and a worked example of timing an order so the slab is never waiting for steel.7 min read
- 6.2 Supplier Rate History Tracking That Actually Saves MoneyYou cannot negotiate against a rate you do not remember. A simple monthly rate register turns every future purchase into an informed one — here is the format and a worked rate-lock example.7 min read
- 6.3 Comparing Quotations: Landed Cost, Not Sticker PriceThe supplier with the lowest quoted rate wins most comparisons on Indian sites — and loses many of them on actual cost. A worked 10-tonne steel comparison shows how to find the real number.7 min read
- 6.4 Purchase Orders and GRN DisciplineThe PO is your contract; the GRN is your evidence. A worked steel-delivery check shows how counting bars and reading the weighbridge slip caught a Rs. 8,990 shortage the invoice would have hidden.7 min read
- 6.5 Material Reconciliation and Wastage NormsConsumption minus theory equals wastage — or leakage. A worked cement reconciliation catches 26 excess bags, and a table of accepted wastage planning ranges tells you when to worry.8 min read
- 6.6 Weekly Cost Control Reports the Owner Will ReadOwners do not ignore cost reports because they dislike numbers; they ignore reports that answer no question. One page, five columns, three variances with actions — here is the format, fully worked.7 min read