Kohinoor City Residential Phase 2 Block 2
by Kohinoor Developers
About Kohinoor City Residential Phase 2 Block 2
Project Overview
Kohinoor City Residential Phase 2 Block 2 is a Residential / Group Housing project developed by Kohinoor Developers in Kurla, Mumbai Suburban district. The project is registered with MahaRERA under registration number P51800003258, with the Brihanmumbai Mahanagar Palika (BMC) as the planning authority. The development comprises six buildings — 12A, 12B, 13, 14, 20A, and 20B — each 14 floors (10 habitable), with a total of 209 units (197 residential + 12 non-residential), on a land area of approximately 1.468 acres (5,938.78 sq m) at CTS No. 637/B/1A of Village Kurla 2, Kirol Road, Kurla, Mumbai 400070. The original RERA completion date was 31 December 2019, revised to 31 December 2025.
Of the 209 units, 208 are sold and 1 is booked. The project sits to the north of Kohinoor City Residential Phase 1 Block 1, forming part of a larger Kohinoor City township complex.
Location & Connectivity
Kurla is a major Central Railway suburb in Mumbai, at the junction of the Central and Harbour lines. Kirol Road gives this project a quiet residential approach off the main Kurla roads. The eastern boundary is a DP Road, the northern boundary is a DP Reservation Garden and another DP Reservation, and the western boundary is a DP Reservation R.G. — providing setbacks from major roads and green-zone buffers.
Kurla railway station, LBS Marg, Eastern Express Highway, and BKC (approximately 4–5 km) provide excellent connectivity. Bandra-Kurla Complex, Dharavi, and Ghatkopar are all within 5–10 km. Pincode 400070.
Developer & Approvals
Kohinoor Developers is the registered promoter — a company under the Kohinoor Group that has been active in Mumbai's Kurla and suburban markets.
Approvals on record with MahaRERA:
- RERA Registration Certificate (P51800003258)
- Building Plan Sanction (Brihanmumbai Mahanagar Palika)
- Fire Safety NOC
- Environment Clearance / Consent to Establish
- Sewerage & Water Connection Approval
Configurations & Amenities
The six buildings have the following unit distributions per the MahaRERA filing:
- Building 12A: 30 residential units
- Building 12B: 36 residential units
- Building 13: 36 residential units
- Building 14: 36 residential units
- Building 20A: 39 residential + 7 non-residential = 46 units
- Building 20B: 20 residential + 5 non-residential = 25 units
Specific BHK types and carpet areas are not individually enumerated. With 208 of 209 units sold, availability is extremely limited. Recreational open space: 1,061.83 sq m. Confirm amenity details from RERA-filed declaration.
Investment & Buyer Due Diligence
With near-complete sellout and a December 2025 revised deadline: (a) verify OC/CC on MahaRERA (P51800003258) and with BMC; (b) clarify completion timeline for each of the six buildings; (c) verify the 1 booked unit's availability for end-buyers; (d) check DP Reservation Garden boundary status and any restrictions; (e) review CTS No. 637/B/1A, Kurla 2 village records; and (f) confirm society formation and maintenance structure across all six buildings.
Project Details
- Project Name
- Kohinoor City Residential Phase 2 Block 2
- Developer/Promoter
- Kohinoor Developers
- Location
- Kurla
- District
- Mumbai Suburban
- City
- Mumbai
- State
- Maharashtra
- Project Type
- Residential / Group Housing
- Units/Towers
- 209
- Expected Completion
- 2025-12-31
- Amenities
- 24x7 Security with CCTV, Power Backup, High-Speed Passenger Lifts, Landscaped Gardens, Swimming Pool, Gymnasium, Clubhouse, Children's Play Area, Jogging Track, Indoor Games Room, Multipurpose Hall, Ample Visitor Parking, Rainwater Harvesting, Fire Safety System
RERA Registration
- RERA Number
- P51800003258
- Status
- Lapsed
Always verify project registration on the official RERA portal before making any investment decisions.
Managing This Project?
Track tasks, inventory, and expenses with Site Setu - the construction super app.
Start Free TrialRelated Links
Verification Reminder
Match the promoter, project phase, registration number, and status on the official portal before you treat this listing as verified.
Open MahaRERARead the full verification workflowHRERA Detailed Information
Promoter Information
- Company Name
- Kohinoor Developers
Land Details
- Total Area
- 1.468 Acres
Unit Details
- Total Units
- 209
Project Timeline
- Expected Completion
- 2025-12-31
Approvals & Clearances
Drawing Review & Quality Assessment
Building Overview
- Building Type
- apartment
- Total Units
- 209
Unit Breakdown
| Type | Area | Count |
|---|---|---|
| - | ||
| - | ||
| - | ||
| - | ||
| - | ||
| - |
Review Summary
Backfilled from an already collected MahaRERA public-view bundle without adding speculative market facts.
Similar RERA projects in Kurla
Projects in Mumbai with overlapping price bracket or BHK configuration.
Explore all Mumbai RERA projects
Jump to city and state hubs, neighbouring markets, and top metros to keep browsing.
Streamline Your Construction Project
From task management to inventory tracking, Site Setu helps construction teams work smarter with a mobile-first platform built for Indian construction sites.