DLF PRIVANA WEST (RERA GGM/819/551/2024/46): price, possession and the verified record

DLF PRIVANA WEST is a project by DLF LIMITED at Sectors 76 and 77, Gurugram, registered with Haryana Real Estate Regulatory Authority, Gurugram as GGM/819/551/2024/46.

No conflicts found15 approved documentsReviewed 2026-08-02
On requestPrice band
—Units registered
—Registered area
—Latest declared completion
—Declared project cost

Is DLF PRIVANA WEST RERA approved?

Yes. It is registered with Haryana Real Estate Regulatory Authority, Gurugram under GGM/819/551/2024/46 and 0 recorded approvals.

  • Building plan approvalNot in the reviewed filing
  • AAI height clearanceNot in the reviewed filing
  • Environment clearanceNot in the reviewed filing
  • Fire scheme approvalNot in the reviewed filing
  • Consent to establishNot in the reviewed filing
  • Occupancy certificateNot expected until completion

Source: Haryana Real Estate Regulatory Authority, Gurugram registration certificate GGM/819/551/2024/46.

What is the price of DLF PRIVANA WEST?

No price is published against this registration. Any figure you are shown should be confirmed in writing against RERA number GGM/819/551/2024/46.

Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.

Who is the developer of DLF PRIVANA WEST?

The promoter on record is Dlf Limited, marketed as DLF LIMITED.

Source: the authority's promoter disclosure and the filed financial schedule.

What do the approved plans for DLF PRIVANA WEST show?

The layout, floor plans and elevations as filed. Every sheet below is rendered from a document the promoter lodged with Haryana Real Estate Regulatory Authority, Gurugram, and opens to the original upload — nothing here is a brochure render.

Source: the 15 documents filed under this registration.

What new facts were verified for DLF PRIVANA WEST?

The research pass added 6 source-backed facts without replacing the information already published. Identifier classes and registered scope are shown separately so a portal ID is never presented as the issued registration number.

/license
number: 219 of 2023 · issued On: 2023-10-25 · valid Through: 2028-10-24
RERA filing · high confidence
/location
state: Haryana · city: Gurgaon · locality: Sectors 76 and 77 · address: Sectors 76 and 77, Gurugram
RERA filing · high confidence
/projectType
Group Housing under NILP Policy
RERA filing · high confidence
/registeredPromoter/name
DLF LIMITED
RERA filing · high confidence
/name
DLF PRIVANA WEST
RERA filing · high confidence
/rera/validity
valid From: 2024-04-22 · valid Through: 2031-12-31 · endpoint Semantics: Registration validity endpoint based on promoter-declared REP-II date; not evidence of completion, possession or occupancy.
RERA filing · high confidence

Source: the project claim ledger and its retained RERA or reviewed research evidence.

Is it safe to buy in DLF PRIVANA WEST?

The registration itself is sound — identity, scope and phase all check out. 1 thing is still open. Resolve that before you pay.

Registration endpoint is not a delivery date
The listed 31 December 2031 endpoint is not evidence of completion, possession or occupancy. Check the latest project-scoped status and any extension.
What to ask for: Reopen the live Haryana RERA record and obtain any extension, completion or occupancy document scoped to this certificate.

Source: Site Setu agent-reviewed dossier, 2026-08-02. Record-quality assessment, not investment advice.

The verified record behind this page

Every figure above comes from a document filed with Haryana Real Estate Regulatory Authority, Gurugram. This is the audit that produced them — 6 dimensions assessed, every fact carrying its own confidence.

Record review

Agent-reviewed 2026-08-02 · 7 facts checked · 6 dimensions

Identity and registration
Supported
Authority identity is sufficiently specific
Delivery and commercial facts
Not sourced
Current delivery evidence is incomplete
Visual audit coverage
Not sourced
Audit inventory has stated access limits
Public media attribution
Supported
Retained media is target-specific
Scope separation
Needs a look
Broader or conflicting material excluded
Delivery inference
Not sourced
Drawings and filings are not progress proof
Registered identity and scope
Dlf Privana WestResidential registration at SECTOR 76/77; Privana West registration.
high
Legal promoter and certificate
Dlf Limited — Ggm/819/551/2024/46Haryana RERA authority project ID RERA-GRG-1540-2024.
high
Registration timeline
Registered 22 April 2024; listed through 31 December 2031The endpoint is not treated as possession, completion or occupancy.
high
Completed visual audit inventory
150 files accounted forVerdicts: 132 MATCH, 16 PARTIAL-MIXED, 1 MISMATCH, 0 UNREADABLE and 1 INACCESSIBLE.
high
Visual review coverage
539 pages visually reviewedEvery accessible page was visually reviewed: yes; overall content coverage complete: no.
not-reported
Curated public media
12 audited itemsOnly accessible, project-specific material was retained; duplicates and prohibited generic/personnel assets were excluded.
high
Current delivery evidence
Not established by the completed document auditPlans, certificates, marketing images and registration dates do not prove present construction, completion, occupancy, possession, inventory, price or availability.
not-reported
▸ How this review was done, and what it excluded
Audited drawings are not delivery evidence
12 retained plan or elevation files show filed design intent, not built condition, completion, possession or occupancy.
Obtain: Verify current project-scoped progress, completion and occupancy filings before making delivery claims.
Audit scope and access limits
The canonical SiteSetu route returned a generic 404/not-found response and could not be visually reviewed as a project page. The earlier staged response diverged from the current live West response and contained South content; stale South assets were excluded and no South fact was transferred. QPR/quarterly-detail pages and nested documents were not recursively crawled; this is a one-hop authority/Form A-H audit. No rights-cleared local architectural drawing bundle exists for this registration, so localDrawings remains empty. Authority filings establish submitted registration/document context but do not independently establish current construction, completion, occupancy, inventory, price, amenities or availability. The disclosed DLF promoter URL is generic corporate context; no project-specific DLF PRIVANA WEST page or media asset was retained.
Obtain: Use only accessible target-specific records and revisit the current authority archive for later project-scoped filings.
Authority
Haryana Real Estate Regulatory Authority, Gurugram
Registration
GGM/819/551/2024/46
Documents seen
12 drawing sets, 3 authority documents
3D reconstruction
Not built
Not established
Occupancy certificate, current construction progress, live inventory, dated unit-level offer

Source: Haryana RERA authority record, project preview and registered-projects listing

The same filings, as a working project plan

A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.

DLF PRIVANA WESTDemo · read only

Overview

DLF PRIVANA WEST

From the RERA filing
0
Approvals on file
of 6 typical
15
Documents on file
plans, approvals, legal

Record timeline

    Project card

    Promoter
    Dlf Limited
    Registration
    GGM/819/551/2024/46
    Authority
    Haryana Real Estate Regulatory Authority, Gurugram

    This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.

    Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.

    Other registered projects nearby

    Same corridor, same authority. Compared on what is filed, not on what is advertised.

    ProjectPromoterPricePossession
    DLF PRIVANA WESTDLF LIMITEDOn request—
    SUMMIT PLAZADLF LIMITEDOn request—
    DLF PRIVANA SOUTHDLF LIMITEDOn request—
    CLUB ARCADEDLF LIMITEDOn request—
    Privana EnclaveDLF LIMITEDOn request—
    DLF The ArbourDLF LimitedRs 7.31 Cr - 9 Cr onwardsMarch 2030