Skip to main content
This page is unclaimed. Built from 2 of Smartworld Developers’s filings. No promoter has verified it.

Smart World Sky Arc (RERA RC/REP/HARERA/GGM/878/610/2024/105): price, possession and the verified record

Smart World Sky Arc is a 3/3.5/4.5 BHK project by Smartworld Developers at Sector 69, Gurugram, registered with Delhi RERA as RC/REP/HARERA/GGM/878/610/2024/105 and listed at Rs 3 Cr onwards.

1 conflicting field3/3.5/4.5 BHK2 approved documentsReviewed 2026-07-30
Rs 3 Cr onwardsPrice band
—Units registered
—Registered area
Under ConstructionLatest declared completion
—Declared project cost

Is Smart World Sky Arc RERA approved?

Yes. It is registered with Delhi RERA under RC/REP/HARERA/GGM/878/610/2024/105 and 6 recorded approvals.

  • Building plan approval
  • AAI height clearance
  • Environment clearance
  • Fire scheme approval
  • Consent to establish
  • Occupancy certificate

Source: Delhi RERA registration certificate RC/REP/HARERA/GGM/878/610/2024/105.

When is possession at Smart World Sky Arc?

The record gives one declared completion date: Under Construction. A declared date is what the promoter filed, not proof of delivery.

Under Construction
weakest
Marketing / listing material · also in The promoter's own RERA filing, Retained timeline reference

None of these is an occupancy certificate. A declared completion date is what the promoter filed, not proof of delivery.

Source: the promoter's RERA filing (Form REP-I) and the authority's registered-project index.

What is the price of Smart World Sky Arc?

Publicly listed at Rs 3 Cr onwards for 3/3.5/4.5 BHK. No dated, unit-specific price list was sourced against this registration, so treat the band as indicative rather than an offer.

Amenities on record

  • 24x7 Security with CCTV
  • Power Backup
  • High-Speed Passenger Lifts
  • Landscaped Gardens
  • Swimming Pool
  • Gymnasium
  • Clubhouse
  • Children's Play Area
  • Jogging Track
  • Indoor Games Room
  • Multipurpose Hall
  • Ample Visitor Parking
  • Rainwater Harvesting
  • Fire Safety System

Source: the filed unit schedule. Price band from public listings; not promoter-confirmed.

Who is the developer of Smart World Sky Arc?

The promoter on record is Smartworld Developers, marketed as Smartworld Developers.

Source: the authority's promoter disclosure and the filed financial schedule.

What do the approved plans for Smart World Sky Arc show?

The layout, floor plans and elevations the promoter publishes. These are promoter-issued sheets, not documents lodged with Delhi RERA — treat the dimensions on them as indicative until you see the sanctioned set.

Source: 0 filed under this registration, plus promoter-issued sheets reviewed for provenance.

Is it safe to buy in Smart World Sky Arc?

The registration itself is sound — identity, scope and phase all check out. 2 things are still open, and the completion date is the one field two authority sources disagree on. Resolve that before you pay.

Jurisdiction and registration need matching
The Delhi directory bucket and RC/REP/HARERA/GGM/878/610/2024/105 field do not by themselves establish the applicable authority record for Smart World Sky Arc.
What to ask for: Match project, promoter, city and certificate to the proposed unit.
No OC/CC or current offer reviewed
No certificate, case/order, inventory, price or agreement establishes the current position for Smart World Sky Arc.
What to ask for: Obtain current authority and unit-specific documents.

Source: Site Setu agent-reviewed dossier, 2026-07-30. Record-quality assessment, not investment advice.

The verified record behind this page

Every figure above comes from a document filed with Delhi RERA. This is the audit that produced them — 4 dimensions assessed, every fact carrying its own confidence.

Record review

Agent-reviewed 2026-07-30 · 7 facts checked · 4 dimensions · 1 unresolved conflict

Jurisdiction
Conflicting
Delhi bucket is unreliable
Registration
Needs a look
Registration boundary explicit
Delivery
Not sourced
No certificate evidence reviewed
Commercial and cases
Not sourced
No current transaction evidence
Canonical registration field
Rc/Rep/Harera/Ggm/878/610/2024/105Retained canonical authority-style registration.
high
Jurisdiction boundary
Gurugram Sector 69The project context is Gurugram, not Delhi.
conflicting
Legal promoter
Smartworld DevelopersRetained promoter identity is not replaced by a brand label.
medium
Scheme/phase boundary
Not established from reviewed authority filingNo broader brand or city-bucket facts are substituted.
not-found
Timeline
Under ConstructionThis is not a reviewed completion or occupancy certificate.
low
OC, CC and cases
Not established in reviewed materialNo scoped certificate, case or order result was reviewed.
not-found
Current commercial terms
Not independently verifiedNo dated inventory, price sheet or agreement was reviewed.
not-found
▸ How this review was done, and what it excluded
Authority
Delhi RERA
Registration
RC/REP/HARERA/GGM/878/610/2024/105
Documents seen
2 drawing sets, 0 authority documents
3D reconstruction
Not built
Not established
Occupancy certificate, current construction progress, live inventory, dated unit-level offer

Source: Retained canonical authority-derived material and Site Setu editorial review

The same filings, as a working project plan

A RERA filing already contains a programme, a cost plan, an approvals register and a drawing register — just locked inside PDFs. This is that filing rendered as a live Site Setu workspace, with nothing added.

Smart World Sky ArcDemo · read only

Overview

Smart World Sky Arc · Sector 69, Delhi

From the RERA filing
6
Approvals on file
of 6 typical
2
Documents on file
plans, approvals, legal

Record timeline

  1. Under ConstructionMarketing possession claimweakest

Project card

Promoter
Smartworld Developers
Registration
RC/REP/HARERA/GGM/878/610/2024/105
Authority
Delhi RERA

This is a read-only view built from the filing. In your own workspace these become live — progress, spend and inventory update as your site team reports them.

Every value read from this project’s own filing. Where the record publishes nothing — construction progress, collections, sold inventory — the workspace shows an empty column rather than an invented number.

Other registered projects nearby

Same corridor, same authority. Compared on what is filed, not on what is advertised.

ProjectPromoterPricePossession
Smart World Sky ArcSmartworld DevelopersRs 3 Cr onwards—
Smart World One DXPSmartworld DevelopersRs 2 Cr onwardsDecember 2028
SOBHA AltusSobha LimitedRs 6.7 Cr onwardsApril 2028
SOBHA AranyaSobha LimitedRs 4 Cr onwardsUnder Construction
Signature Global Twin Tower DXPSignature GlobalRs 3 Cr onwardsMarch 2029
SOBHA City Phase 5Sobha LimitedRs 1.5 Cr onwardsDecember 2026